Fred,
as I mentioned in my e-mail, screw is covered by enclosure, same as any other
primary AC component, it is inside the box, nothing exposed on the outside. 
It is still in development so if there a real problem, it will be fixed. 
Mark


________________________________

From: [email protected]
To: [email protected]; [email protected]
Subject: RE: concern for metal screw touching AC trace on the PCB
List-Post: [email protected]
Date: Wed, 6 Oct 2010 17:52:34 -0700



Mark:

>From an engineering standpoint I assume this is a screw-up that management
doesn’t want to spend the money to fix. From a legal standpoint I assume
this is a known defect. Are there adequate warning labels to protect both the
user and service personnel?

 

I have a hunch, not to be confused with a WAG, that it would be cheaper to fix
the problem than apply warning labels.

 

Fred Townsend

DC to Light

 

From: [email protected] [mailto:[email protected]] On Behalf Of Mark Gandler
Sent: Wednesday, October 06, 2010 4:42 PM
To: [email protected]
Subject: concern for metal screw touching AC trace on the PCB

 

Hi,

let's assume there are 120VAC traces on the top layer of the PCB (AC comes in
>from a detachable  power cord) Right next to the trace (<1mm) 

there is a plastic stand with metal screw (washer build-in) in it. metal
washer lays on top of the AC trace, separated only by the mask.

Screw is not connected to any grounds or circuits or any other conducted part.
It is untouchable to the user side. 

 

Is where any safety concern? Product is evaluated under 60950. One thing came
to my mind, is a plastic standoff, probably should be able to support high
voltage? is it valid concern? any others?

 

Thanks,

Mark

 

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 
For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 
For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL.
Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 
For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 
For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 

For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 


Reply via email to