What are the required retention times for a test report for EMC testing? I thought the FCC was 10 years from date of last manufacture. Can anyone provide me with the reference to the relevant portion of 47CFR (or whatever portion of CFR it is).
What are the requirements for the European EMC Directive? Here again, a reference would be helpful. Thanks. John D. Flavin Teradata TCP Engineering 17095 Via del Campo San Diego, CA 92127 [email protected] V: (858) 485-3874 F: (213) 337-5432 - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to <[email protected]> All emc-pstc postings are archived and searchable on the web at http://www.ieeecommunities.org/emc-pstc Graphics (in well-used formats), large files, etc. can be posted to that URL. Website: http://www.ieee-pses.org/ Instructions: http://listserv.ieee.org/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas <[email protected]> Mike Cantwell <[email protected]> For policy questions, send mail to: Jim Bacher <[email protected]> David Heald <[email protected]>

