We are going to carry to a damp heat test according to EN54-2 (fire alarm
systems).
The damp heat test has test levels as +40C / 95%Rh and the duration is 21 days
with the equipment POWERED OFF during the test.
 
Question: After 21 days, a functional test shall be carried out. Shall this
test be carried out at the end of the test med damp heat condition or shall
the equipment first be brougth  back to normal conditioning and the functional
tested.
 
Please EN54-2 experts, looking forward to some comments on this issue.
 
Best regards
Amund Westin
Oslo, Norway 
-

This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://www.ieeecommunities.org/emc-pstc
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 

For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 


Reply via email to