Amund,
EN 54-2 1997 says the following on this test “15.14.2.5 Final measurements After the recovery period, subject the specimen to the functional test and inspect it visually for mechanical damage both externally and internally.” The recovery period is defined in the referenced base standard EN 600068-2-78 which states “Relative humidity shall be adjusted to a value of 73 % to 77 % RH in not more than 0,5 h, after which the temperature shall be adjusted to laboratory temperature within 1 K in not more than 0,5 h.” Kind Regards Kevin Harris From: [email protected] [mailto:[email protected]] On Behalf Of amund Sent: Tuesday, July 14, 2009 6:10 AM To: [email protected] Subject: Damp heat test We are going to carry to a damp heat test according to EN54-2 (fire alarm systems). The damp heat test has test levels as +40C / 95%Rh and the duration is 21 days with the equipment POWERED OFF during the test. Question: After 21 days, a functional test shall be carried out. Shall this test be carried out at the end of the test med damp heat condition or shall the equipment first be brougth back to normal conditioning and the functional tested. Please EN54-2 experts, looking forward to some comments on this issue. Best regards Amund Westin Oslo, Norway - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to <[email protected]> All emc-pstc postings are archived and searchable on the web at http://www.ieeecommunities.org/emc-pstc Graphics (in well-used formats), large files, etc. can be posted to that URL. Website: http://www.ieee-pses.org/ Instructions: http://listserv.ieee.org/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas <[email protected]> Mike Cantwell <[email protected]> For policy questions, send mail to: Jim Bacher <[email protected]> David Heald <[email protected]> - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to <[email protected]> All emc-pstc postings are archived and searchable on the web at http://www.ieeecommunities.org/emc-pstc Graphics (in well-used formats), large files, etc. can be posted to that URL. Website: http://www.ieee-pses.org/ Instructions: http://listserv.ieee.org/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas <[email protected]> Mike Cantwell <[email protected]> For policy questions, send mail to: Jim Bacher <[email protected]> David Heald <[email protected]>

