In message <[email protected]>, dated Tue, 27 Nov 2012, Charlie Blackham <[email protected]> writes:


V1.8.1 has brought in some additional requirements, but the draft standard has been around for years

Not in the public domain, so that argument can't be used to hold that everyone should have known about it.

and the published standard added to the OJ with a 26 month transition period.

OK, so there IS a transition period, which the OP seemed to think was not so, but 26 months is odd - should it be 36, which is the normal 3 years?
--
OOO - Own Opinions Only. See www.jmwa.demon.co.uk
The longer it takes to make a point, the more obtuse it proves to be.
John Woodgate, J M Woodgate and Associates, Rayleigh, Essex UK

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc discussion 
list. To post a message to the list, send your e-mail to <[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>

Reply via email to