But breakfast would take four times longer: P = E²/R

If R is fixed, and voltage E is reduced by a factor of 2, then power P 
goes down by a factor of 4.

A more clever design with two heating elements would put those elements 
either in series or parallel, depending on the voltage, and operate at the 
same power in either case.

Donald Borowski
Senior EMC Compliance Engineer
Schweitzer Engineering Labs
Pullman, Washington, USA





From:   "Pete Perkins" <[email protected]>
To:     "'John Allen'" <[email protected]>, 
<[email protected]>
Date:   05/06/2013 08:52 PM
Subject:        RE: [PSES] UL warning regarding a wall receptacle
Sent by:        [email protected]



John,

                 I agree with your comment in today's environment but the
implementation of the required 'green' technology will require almost 
every
household and commercial electrical product to run from a SMPS.  (Well 
maybe
a dumb toaster won't require it, but it could be designed to run on 230V 
and
then take twice as long to make the breakfast toast in those countries 
using
115V.) 

                 Everyone wants smart technology everything so this new 
scenario
should come about rather quickly (maybe in a generation or less).  The
customer won't care what the system voltage is; perhaps the power company
could find clever ways to take advantage of this and relax their system
voltage regulation requirement.  Or maybe it won't be the power company
controlling this but, rather, the smart grid taking power from all the
neighbors renewable energy stations and sharing it locally.  Should be an
interesting time; by then we will have learned more about both protection
and operation under these broader V conditions - brownout saver circuits 
for
the low end and better OV protection on the other.  It looks like fun 
times
are coming to a power system close to you. 

:>)     br,     Pete

 

Peter E Perkins, PE

Principal Product Safety Engineer

PO Box 23427

Tigard, ORe  97281-3427

 

503/452-1201     fone/fax

[email protected]

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>

Reply via email to