Hi Carl,

The 2 tests have different purposes, as explained in the -2 rationale doc.
I think it's difficult to definitively state that either the S.1 test or
the S.2 test is more stringent than the other. Note that the pass/fail
criteria are different for the 2 tests, with only S.2 requiring that no
additional holes develop.

Note that a fire enclosure that does not meet PIS separation requirements
of 6.4.8.4 would have to comply with both S.1 and S.2, be rated V-1 and
comply with S.2, or be rated V-0 or better (no additional test).

On Wed, May 6, 2020 at 11:46 AM John Woodgate <[email protected]> wrote:

> This is the sort of thing that can easily happen in a huge document. It is
> extremely difficult, especially where there is a chain of forward and back
> cross references, and text pushed off from its primary context to multiple
> annexes, to ensure internal consistency.
> Best wishes John Woodgate OOO-Own Opinions Only www.woodjohn.uk Rayleigh,
> Essex UK MAY THE VIRUS NOT BE WITH YOU
> On 2020-05-06 18:35, Carl Newton wrote:
>
> I'm wondering if any list members can explain the rationale behind
> 62368-1,  in sections 6.4.8.2.2 and 6.8.8.4.  I'm looking at the 2014
> edition.
>
> Clause 6.4.6,  Control of fire spread in a PS3 circuit, states that, "*Fire
> spread in PS3 circuits shall be controlled by applying all of the following
> supplementary safeguards*:".  In that clause it includes, "*by providing
> a fire enclosure as specified in 6.4.8.*"
>
> Clause 6.4.8.2.2, * Requirements for a fire enclosure*, states "*For
> circuits where the available power does not exceed 4 000 W (see 6.4.1), a
> fire enclosure shall comply with the requirements of Clause S.1.*"  That
> clause then goes on to say that V-1 is acceptable....
>
> Clause (6.4.8.4) is addressing "Separation of a PIS from a fire enclosure
> and a fire barrier" and is only requiring the application of the S.2 flame
> test, which I believe is less demanding in that only a 60 s flame is
> applied rather than three steps up to 120 s for the S.1 test method.
> Clause 6.4.8.4 then goes on to state that a V-0 material is excluded from
> the requirement.  So unless I'm mistaken, this clause 6.4.8.4 (which
> addresses separation) is requiring a lesser flame requirement than S.1, yet
> goes on to exclude V-0, but not V-1.
>
> I don't see the rationale.  I must be missing something here. The most
> fundamental question in my mind here is why does 6.8.8.4 allow the S.2 test
> method?
>
> Thanks,
>
> Carl
> -
> ----------------------------------------------------------------
>
> This message is from the IEEE Product Safety Engineering Society emc-pstc
> discussion list. To post a message to the list, send your e-mail to <
> [email protected]>
>
> All emc-pstc postings are archived and searchable on the web at:
> http://www.ieee-pses.org/emc-pstc.html
>
> Attachments are not permitted but the IEEE PSES Online Communities site at
> http://product-compliance.oc.ieee.org/ can be used for graphics (in
> well-used formats), large files, etc.
>
> Website: http://www.ieee-pses.org/
> Instructions: http://www.ieee-pses.org/list.html (including how to
> unsubscribe) <http://www.ieee-pses.org/list.html>
> List rules: http://www.ieee-pses.org/listrules.html
>
> For help, send mail to the list administrators:
> Scott Douglas <[email protected]>
> Mike Cantwell <[email protected]>
>
> For policy questions, send mail to:
> Jim Bacher <[email protected]>
> David Heald <[email protected]>
>
> -
> ----------------------------------------------------------------
>
> This message is from the IEEE Product Safety Engineering Society emc-pstc
> discussion list. To post a message to the list, send your e-mail to &LT;
> [email protected]&GT;
>
> All emc-pstc postings are archived and searchable on the web at:
> http://www.ieee-pses.org/emc-pstc.html
>
> Attachments are not permitted but the IEEE PSES Online Communities site at
> http://product-compliance.oc.ieee.org/ can be used for graphics (in
> well-used formats), large files, etc.
>
> Website: http://www.ieee-pses.org/
> Instructions: http://www.ieee-pses.org/list.html (including how to
> unsubscribe) <http://www.ieee-pses.org/list.html>
> List rules: http://www.ieee-pses.org/listrules.html
>
> For help, send mail to the list administrators:
> Scott Douglas &LT;[email protected]&GT;
> Mike Cantwell &LT;[email protected]&GT;
>
> For policy questions, send mail to:
> Jim Bacher &LT;[email protected]&GT;
> David Heald &LT;[email protected]&GT;
>


-- 
Scott Aldous | Regulatory Compliance Manager | [email protected] |
 650-253-1994

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>

Reply via email to