Bob:

Put a DPST switch in the panel.  One side provides ground for the 
solenoid coil. the other side connects the field wire of the generator 
to the regulator.  Electrically, you splice the wire back together at 
the old switch location and cut it under the panel and route it through 
the switch.  Practically, you'll probably want to replace it all together.

Don't know squat about transponders.

-- 
John Cooper
Skyport East
www.skyportservices.net

Reply via email to