In a long-anticipated change of pace, we have decided to publish the
Gizmocopter Work Session Notes onto erps-list.  Hopefully I will have time
to put the previous Work Sessions' notes up on the Gizmocopter web page
soon, but we shall see.

----------------------------------------------------------------------------
------
September 26, 2002 Work Session Notes

The meeting began at 7:45 and was attended by Nate, Bill, Sarija, Sean, Dave
M., Christopher D'urso, several cats and a puppy.  Dinner was chicken stir
fry.  

We attempted to drill mounting holes into the new baseplate, but were
stymied by some missing PC-104 support bases.  The new baseplate was
developed in order to move the battery packs out from an enclosed space
under the PC-104 stack to allow much better air circulation across the
batteries and therefore greater battery cooling.

Dave continued his work on the real time Linux code: attempting to integrate
the quaternion conversion and rotation operations into the less time
critical components of the control code.  We are also waiting for a
replacement PC-104 CPU from Diamond Systems to address our Disk on Chip
issues.   We are hoping the PCB will arrive next week.

We built a prototype PWM circuit utilizing an NE555, a voltage comparator
and a diode-protected 2N2222 transistor.  Using a potentiometer in lieu of a
DAC we were able to vary the speed of a 3Vdc hobby motor across a wide range
without burning up the 2N2222.

The session ended at 11:25.  The next work session will be held in 2 weeks
on October 10th.


_______________________________________________
ERPS-list mailing list
[EMAIL PROTECTED]
http://lists.erps.org/mailman/listinfo/erps-list

Reply via email to