You are soo NOT supported... Without seeing anything, I would say the process hasn't completed yet.
Got backups? -------------------------------------------- Don Ely Network Engineer Tripath Imaging, Inc. (336) 290-8293 - Direct (336) 516-4519 - Mobile [EMAIL PROTECTED] - email http://www.tripathimaging.com -----Original Message----- From: Olivier de Heer [mailto:[EMAIL PROTECTED]] Sent: Monday, April 15, 2002 2:40 AM To: Exchange Discussions Subject: Eseutil (Exchange 5.5) Dear all, Over the weekend we did a compress of a priv.edb (60.5 GB). Yesterday (Sunday) evening around 22:30 the process did reach the 100% mark. From my humble experience I know that Exchange finishes the process with a small report telling us how long the overall process did take. Well, the report isn't here yet and it's 08:30 Monday morning local time. Looking at the priv.edb database in the MDBDATA directory it's 53.1 GB big and got a time stamp (modified/accessed) of Sunday 10:30 PM. So I think the process is finished and I can start the Information Store Service. Am I right on this one or do I have to wait until the report pops up? (We have to be 100% sure on this of course and I don't want to screw up things.) Many thanks in advance, Olivier _________________________________________________________________ List posting FAQ: http://www.swinc.com/resource/exch_faq.htm Archives: http://www.swynk.com/sitesearch/search.asp To unsubscribe: mailto:[EMAIL PROTECTED] Exchange List admin: [EMAIL PROTECTED] _________________________________________________________________ List posting FAQ: http://www.swinc.com/resource/exch_faq.htm Archives: http://www.swynk.com/sitesearch/search.asp To unsubscribe: mailto:[EMAIL PROTECTED] Exchange List admin: [EMAIL PROTECTED]