Hope you have a good backup. How long have you been waiting for the process to run now?
--Kevinm TSSSBE, M, WLKMMAS, UCC+WCA, And Beyond http://www.daughtry.ca/ For Graphics and WebDesign, GO here! -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED]] On Behalf Of Olivier de Heer Sent: Sunday, April 14, 2002 11:40 PM To: Exchange Discussions Subject: Eseutil (Exchange 5.5) Dear all, Over the weekend we did a compress of a priv.edb (60.5 GB). Yesterday (Sunday) evening around 22:30 the process did reach the 100% mark. From my humble experience I know that Exchange finishes the process with a small report telling us how long the overall process did take. Well, the report isn’t here yet and it’s 08:30 Monday morning local time. Looking at the priv.edb database in the MDBDATA directory it’s 53.1 GB big and got a time stamp (modified/accessed) of Sunday 10:30 PM. So I think the process is finished and I can start the Information Store Service. Am I right on this one or do I have to wait until the report pops up? (We have to be 100% sure on this of course and I don't want to screw up things.) Many thanks in advance, Olivier _________________________________________________________________ List posting FAQ: http://www.swinc.com/resource/exch_faq.htm Archives: http://www.swynk.com/sitesearch/search.asp To unsubscribe: mailto:[EMAIL PROTECTED] Exchange List admin: [EMAIL PROTECTED] _________________________________________________________________ List posting FAQ: http://www.swinc.com/resource/exch_faq.htm Archives: http://www.swynk.com/sitesearch/search.asp To unsubscribe: mailto:[EMAIL PROTECTED] Exchange List admin: [EMAIL PROTECTED]