Darcy,
I don't think it's possible what you want .
I think Darcy is asking to copy a range of systems' optimization and
copy it to a different location - he's not asking to SHIFt
optimization. I'm afraid you have to do it one-by-one - by the way
your example below should have read:
...let's say I want to copy the current optimizations for systems
10-99 and copy them to systems 100-199 (otherwise it does look like
you want to shift optimization)
Good luck,
Thomas
On Dec 13, 2007, at 11:57 PM, Christopher Smith wrote:
It's TGTool > Layout > Shift System Optimisation. You need version
2.45, now available on his site. You would shift by 1.
Christopher
On Dec 14, 2007, at 12:16 AM, Darcy James Argue wrote:
Hi Robert,
I'm afraid I don't see it. TGTools -> Modify -> Shift has options
for Notes, Glissandi, Accis, Widths, and Sixths -- nothing about
layout.
Cheers,
- Darcy
-----
[EMAIL PROTECTED]
Brooklyn, NY
On 13 Dec 2007, at 1:44 PM, Robert Patterson wrote:
Not with Staff List Manager. Look at the Shift... menu option. I
think
it will do what you want.
On Dec 13, 2007 12:37 PM, Darcy James Argue <[EMAIL PROTECTED]> wrote:
Using TGTools Staff List Manager, is there any way to take the
optimization settings (including distance between systems, etc).
from,
a RANGE of systems and copy it to a different range of systems? For
instance, let's say I want to copy the current optimizations for
systems 10-99 and shift them to systems 11-100?
I understand I can take the optimization settings for ONE system
and
copy them to a range of systems, but that's not what I want.
Cheers,
- Darcy
_______________________________________________
Finale mailing list
Finale@shsu.edu
http://lists.shsu.edu/mailman/listinfo/finale
_______________________________________________
Finale mailing list
Finale@shsu.edu
http://lists.shsu.edu/mailman/listinfo/finale