On 2011-02-14, at 12:09 PM, Colin Clark wrote: > I'd love to help out with the release process, too. I was the release manager > for 1.3 and stumbled across a few things in our process documentation that > was a bit out of date or rough-edged. > > Perhaps we can go through the release process together, and we can ensure > that the documentation is up to date with our latest switch to Git and other > things we've streamlined over the past year or two. > > What do you think?
Sounds good to me. I'll have a go at updating the process documentation before we actually start, and run it by you to make sure I haven't missed anything you found. We can work from it for the actual release, and tweak it based on the experience. -- Anastasia Cheetham Inclusive Design Research Centre [email protected] Inclusive Design Institute OCAD University _______________________________________________________ fluid-work mailing list - [email protected] To unsubscribe, change settings or access archives, see http://fluidproject.org/mailman/listinfo/fluid-work
