Fred

John Shepherd (cc) did a graphical analysis of this issue, which I found
very helpful.

I've cc'd him, and maybe he can provide the graph.

A
On Sep 24, 2013 2:54 PM, "Fred Zimmerman" <[email protected]>
wrote:

> We spend a lot of time discussing the merits of individual approaches to
> geoengineering and arguing for prioritizing one or the other.
>
> Assuming hypothetically that
>
> 1) all methods, all flavors of SRM/CDR are "approved" by a governance
> authority
> 2) all methods, all flavors are assigned values for "years to deployment"
> and "RF per year" and "cost per unit of RF"
>
> has anyone done an exercise modeling the optimum mix across all
> methods/all flavors? if some methods/flavors are disapproved?  if values
> are modified?
>
>
> ---
> Fred Zimmerman
> Geoengineering IT!
> Bringing together the worlds of geoengineering and information technology
> GE NewsFilter: http://geoengineeringIT.net:8080
>
> --
> You received this message because you are subscribed to the Google Groups
> "geoengineering" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to [email protected].
> To post to this group, send email to [email protected].
> Visit this group at http://groups.google.com/group/geoengineering.
> For more options, visit https://groups.google.com/groups/opt_out.
>

-- 
You received this message because you are subscribed to the Google Groups 
"geoengineering" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/geoengineering.
For more options, visit https://groups.google.com/groups/opt_out.

Reply via email to