Today is July 1st.  We have our 1.0beta release scheduled for August 1st.

For the most part, the work left to be done is covered by tickets in Trac
for milestone 1.0 or prior.
http://projects.opengeo.org/CAPRA/report/3

The exceptions (which I hope to correct soon) are:
  * The Batch Uploader tickets, which have yet to be made
  * Some security items (possibly, I need to double-check this)
  * Tickets that will result from the UI review coming up at the end of this
week.  After the tickets are made, we'll triage them with input from the
World Bank.
  * Anything discovered during testing

Delivering on this is our number one priority for this month.  Please orient
yourselves accordingly: please test, make tickets, and raise issues to the
list liberally.  And please keep a lookout for Trac notifications, as these
will carry critical information.

I think if we keep focused for this month we may come out with a 1.0beta
that won't require much work before being released as 1.0.  That would mean
we could release before FOSS4G, which would be ideal.

Thanks,

-- 
Sebastian Benthall
OpenGeo - http://opengeo.org

Reply via email to