On Wed, Aug 27, 2014 at 8:34 AM, Jody Garnett <[email protected]>
wrote:
> Watching the download status for 2.6-beta and 2.6-RC1, and judging from
> the lack of feedback it appears an RC2 will not be needed.
>
> The only changes I know are in the pipe are documentation and readme fixes
> - which should not require an RC2.
>
I was wondering also about the timeframe angle.... the RC2 should be
September 3rd, if we want to make final during
FOSS4G that would be the 12th.... a bit tight, but maybe we can fit it
Cheers
Andrea
--
==
GeoServer Professional Services from the experts! Visit
http://goo.gl/NWWaa2 for more information.
==
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
-------------------------------------------------------
------------------------------------------------------------------------------
Slashdot TV.
Video for Nerds. Stuff that matters.
http://tv.slashdot.org/
_______________________________________________
Geoserver-devel mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/geoserver-devel