James Annan wrote:
I wonder how many humvees it would take to make a wind turbine?
I believe a 1.5 MW wind turbine and its 200 ft tower weights 160 tons.
A google search on humvees produced the following:
A new model of a protected hummer, designed for six passengers is
currently under development at Plasan. This version is designed to
respond an IDF requirement and will be equipped with a 1.326 ton armor
suite. It will be higher than current Humvees, and will be installed
with a semi-protected firing position which could be substituted with a
remotely controlled weapon station. The total weight of the vehicle
will be 5,496 kg,
Assume 10 percent of the Humvee weight is non-steel. About 27 humvees
would have to be shredded and fed into the blast furmnace.
Its toy replica, the Hummer (nutin dumma than a humma) weighs about
8000 pounds; 20% of which is likely non-steel. So, about 50 Hummers
would have to be dumped into the blast furnace.
BRING EM ON!
--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups Global Change ("globalchange") newsgroup. Global Change is a public, moderated venue for discussion of science, technology, economics and policy dimensions of global environmental change.
Posts will be admitted to the list if and only if any moderator finds the submission to be constructive and/or interesting, on topic, and not gratuitously rude.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to [EMAIL PROTECTED]
For more options, visit this group at
http://groups.google.com/group/globalchange
-~----------~----~----~----~------~----~------~--~---