Dear users,

 In one of the simulations while calculating box dimensions
using g_energy this output was obtained -
Statistics over 50000001 steps [ 0.0000 through 100000.0000 ps ], 3 data
sets
All statistics are over 1978700 points

Energy                      Average   Err.Est.       RMSD  Tot-Drift
-------------------------------------------------------------------------------
Box-X                     0.0453229        1.8   0.637535   -9.93022  (nm)
Box-Y                     0.0453229        1.8   0.637535   -9.93022  (nm)
Box-Z                     0.0320482        1.3   0.450805   -7.02173  (nm)

but the dimensions of the box is different. plot attached.
I am not able to figure out why only 1978700 data point are considered.
Kindly give some suggestions.

Thank you
with regards
M.Kavyashree

<<attachment: box-dimen.png>>

-- 
gmx-users mailing list    [email protected]
http://lists.gromacs.org/mailman/listinfo/gmx-users
Please search the archive at 
http://www.gromacs.org/Support/Mailing_Lists/Search before posting!
Please don't post (un)subscribe requests to the list. Use the 
www interface or send it to [email protected].
Can't post? Read http://www.gromacs.org/Support/Mailing_Lists

Reply via email to