Hi,
I was referring this doc for fan-in
<https://docs.gocd.org/current/advanced_usage/fan_in.html> configuration of
GoCD to set up something like the image shown below.
<https://lh3.googleusercontent.com/-kMQN5GTZBbQ/WlUx-aHoVBI/AAAAAAAAAPo/RSUDZmmLQbsixmRJUt9IOXjSS5_tkBtDACLcBGAs/s1600/Screen%2BShot%2B2018-01-09%2Bat%2B10.18.39%2BPM.png>
I was expecting that "Deploy_Orchestrator_Pre_Prod" to be called once after
all the 3 functional tests run successfully. However, each successful runs
of the functional tests are triggering a deployment.
So, if one of the functional tests fails, still the deployment happens
twice.
One thing that may be an issue here is that all 3 functional tests
pipelines have their own git repository. Is it the case? How can I go about
resolving this?
I would like to deploy only after all 3 build is green. Let me know if you
need further details.
Thank you,
Prasanna
--
You received this message because you are subscribed to the Google Groups
"go-cd" group.
To unsubscribe from this group and stop receiving emails from it, send an email
to [email protected].
For more options, visit https://groups.google.com/d/optout.