Can you provide the full VSM for an instance of the pipeline
Deploy_Orchestrator_Pre_Prod?

On Wed, Jan 10, 2018 at 2:56 AM Prasanna <[email protected]> wrote:

>
> Hi,
>
> I was referring this doc for fan-in
> <https://docs.gocd.org/current/advanced_usage/fan_in.html> configuration
> of GoCD to set up something like the image shown below.
>
>
>
> <https://lh3.googleusercontent.com/-kMQN5GTZBbQ/WlUx-aHoVBI/AAAAAAAAAPo/RSUDZmmLQbsixmRJUt9IOXjSS5_tkBtDACLcBGAs/s1600/Screen%2BShot%2B2018-01-09%2Bat%2B10.18.39%2BPM.png>
>
>
> I was expecting that "Deploy_Orchestrator_Pre_Prod" to be called once
> after all the 3 functional tests run successfully. However, each successful
> runs of the functional tests are triggering a deployment.
>
> So, if one of the functional tests fails, still the deployment happens
> twice.
>
>
> One thing that may be an issue here is that all 3 functional tests
> pipelines have their own git repository. Is it the case? How can I go about
> resolving this?
>
>
> I would like to deploy only after all 3 build is green. Let me know if you
> need further details.
>
>
> Thank you,
>
> Prasanna
>
>
>
>
> --
> You received this message because you are subscribed to the Google Groups
> "go-cd" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to [email protected].
> For more options, visit https://groups.google.com/d/optout.
>

-- 
You received this message because you are subscribed to the Google Groups 
"go-cd" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to