Hi googlers, Im getting this trouble about the undifined dates.
Take a look at this: 01-01-2013, 50 02-01-2013, 100 04-01-2013, 30 Notice that it misses the 03-01-2013. When Annotated timeline chart tries to draw the line bettween the two last dates it connects the two last values (100 and 30). It should connect the 100 (02-01-2013) to 0 (related to the missing date) and then connect to the 30 (04-01-2013). Like it is right now, its like between day 2 and day 4 the values had decresead passing through the day 3. What is wrong, it should be a full decrease to zero, and then increase from zero. How could it be solved? Regards -- You received this message because you are subscribed to the Google Groups "Google Visualization API" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at http://groups.google.com/group/google-visualization-api. For more options, visit https://groups.google.com/groups/opt_out.
