Hi googlers,

Im getting this trouble about the undifined dates.

Take a look at this:

01-01-2013, 50
02-01-2013, 100
04-01-2013, 30

Notice that it misses the 03-01-2013. 

When Annotated timeline chart tries to draw the line bettween the two last 
dates it connects the two last values (100 and 30). 

It should connect the 100 (02-01-2013) to 0 (related to the missing date) 
and then connect to the 30 (04-01-2013).

Like it is right now, its like between day 2 and day 4 the values had 
decresead passing through the day 3. What is wrong, it should be a full 
decrease to zero, and then increase from zero.

How could it be solved?

Regards

-- 
You received this message because you are subscribed to the Google Groups 
"Google Visualization API" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/google-visualization-api.
For more options, visit https://groups.google.com/groups/opt_out.


Reply via email to