You have to add in the data for the date that is missing.  The chart has no 
way of knowing that you mean for there to be data at that point unless you 
provide it.

On Friday, July 5, 2013 9:50:44 AM UTC-4, Pedro GuimarĂ£es wrote:
>
> Hi googlers,
>
> Im getting this trouble about the undifined dates.
>
> Take a look at this:
>
> 01-01-2013, 50
> 02-01-2013, 100
> 04-01-2013, 30
>
> Notice that it misses the 03-01-2013. 
>
> When Annotated timeline chart tries to draw the line bettween the two last 
> dates it connects the two last values (100 and 30). 
>
> It should connect the 100 (02-01-2013) to 0 (related to the missing date) 
> and then connect to the 30 (04-01-2013).
>
> Like it is right now, its like between day 2 and day 4 the values had 
> decresead passing through the day 3. What is wrong, it should be a full 
> decrease to zero, and then increase from zero.
>
> How could it be solved?
>
> Regards
>

-- 
You received this message because you are subscribed to the Google Groups 
"Google Visualization API" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/google-visualization-api.
For more options, visit https://groups.google.com/groups/opt_out.


Reply via email to