Hi everyone, I am using the new Annotation Chart, which is in a way very similar to Annotated Time Line, and I am having 2 functions on it, with double Y axis. Now it all works well, but I need for both functions to start from the same Y point on the left and then continue from there, since I am looking to see their relative correlation. Any ideas how can this be done?
Thanks! -- You received this message because you are subscribed to the Google Groups "Google Visualization API" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at http://groups.google.com/group/google-visualization-api. For more options, visit https://groups.google.com/groups/opt_out.
