I'm back with yet another question. Now that this task is complete, I'm 
trying to apply some advanced features like controls. My first goal is to 
add a filter to the bottom of the timeline where I can draw to just see the 
dates that I want to see. I followed the guidance on the 
https://developers.google.com/chart/interactive/docs/gallery/controls to 
build in a ChartRangeFilter div. Of course, I failed (I'm way in over my 
head now). However, I got an error when I tried to run the program that 
says "[object Object] does not fit either the Control or Visualization 
specification.×"  Is this a result of the hackery that put the multiple 
data tables into one or is it something else? I've attached the program in 
full for reference. The range filter was added within the draw function as 
a variable called rangeSlider. Any ideas?

-- 
You received this message because you are subscribed to the Google Groups 
"Google Visualization API" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/google-visualization-api.
For more options, visit https://groups.google.com/d/optout.

<<< text/html; charset=UTF-8; name=TimelineExperiment.html: Unrecognized >>>

Reply via email to