The ALS survey is still going through IRB here in Kansas City
-----Original Message-----
From: GPC Informatics [mailto:[email protected]]
Sent: Monday, December 15, 2014 9:36 AM
To: Dan Connolly; [email protected]
Cc: Kieran Pemberton; John Steinmetz; Tamara McMahon
Subject: [gpc-informatics] #208: ALS survey timeline unclear
#208: ALS survey timeline unclear
------------------------+-------------------------------
Reporter: dconnolly | Owner: jmcclay
Type: problem | Status: new
Priority: major | Milestone: survey-redcap-als
Component: data-stds | Keywords:
Blocked By: | Blocking:
------------------------+-------------------------------
I our Dec 2 call (notes: #12) it seemed worth increasing bandwidth between
gpc-dev and the ALS group:
Jim McClay: I’ll check with Dr. Fernandez about ALS survey timeline (esp.
REDCap usage).
redcap ALS tickets, for ref: #197, #173
Overall plans (KeyGoalTracking#als-survey) call for the survey to go out in
December. Meanwhile, the breast cancer survey (KeyGoalTracking#bc-
survey) needs a lot of attention in the coming week or two, so if there is
also urgent ALS work, it's important to know.
--
Ticket URL: <http://informatics.gpcnetwork.org/trac/Project/ticket/208>
gpc-informatics <http://informatics.gpcnetwork.org/>
Greater Plains Network - Informatics
_______________________________________________
Gpc-dev mailing list
[email protected]
http://listserv.kumc.edu/mailman/listinfo/gpc-dev