The ALS survey is still going through IRB here in Kansas City

-----Original Message-----
From: GPC Informatics [mailto:[email protected]] 
Sent: Monday, December 15, 2014 9:36 AM
To: Dan Connolly; [email protected]
Cc: Kieran Pemberton; John Steinmetz; Tamara McMahon
Subject: [gpc-informatics] #208: ALS survey timeline unclear

#208: ALS survey timeline unclear
------------------------+-------------------------------
  Reporter:  dconnolly  |      Owner:  jmcclay
      Type:  problem    |     Status:  new
  Priority:  major      |  Milestone:  survey-redcap-als
 Component:  data-stds  |   Keywords:
Blocked By:             |   Blocking:
------------------------+-------------------------------
 I our Dec 2 call (notes: #12) it seemed worth increasing bandwidth between  
gpc-dev and the ALS group:
   Jim McClay: I’ll check with Dr. Fernandez about ALS survey timeline  (esp. 
REDCap usage).

 redcap ALS tickets, for ref: #197, #173

 Overall plans (KeyGoalTracking#als-survey) call for the survey to go out  in 
December. Meanwhile, the breast cancer survey (KeyGoalTracking#bc-
 survey) needs a lot of attention in the coming week or two, so if there is  
also urgent ALS work, it's important to know.

--
Ticket URL: <http://informatics.gpcnetwork.org/trac/Project/ticket/208>
gpc-informatics <http://informatics.gpcnetwork.org/>
Greater Plains Network - Informatics
_______________________________________________
Gpc-dev mailing list
[email protected]
http://listserv.kumc.edu/mailman/listinfo/gpc-dev

Reply via email to