[Though the following article is just over a year old - much before
Fukushima, it remains highly pertinent in the context of the current debates
over the prospects of nuclear power in India.]


http://princeton.academia.edu/MVRamana/Papers/264400/The_Future_of_Nuclear_Power_in_India

The Future of Nuclear Power in India



*MV Ramana*

01/04/2010



In September 2009, while speaking at the inauguration of the International
Conference on the Peaceful Uses of Atomic Energy in New Delhi, Prime
Minister Manmohan Singh stated that India could have 470 gigawatts (GW) of
nuclear capacity by 2050. To put this in perspective, the current nuclear
capacity in the country – more than sixty years after the atomic energy
program was established and forty years after the first nuclear reactor
started feeding electricity to the grid in the country – is just 4.12 GW;
about 3 percent of the total electricity generation capacity. Thus, the
projected capacity in 2050 would represent an increase by a factor of over a
hundred. Is this feasible, or more generally, is nuclear power likely to
become a significant source of electricity for the country?



There are three factors as to why the answers to these questions will be
negative: history, technology, and economics. Politics, at different levels,
could also affect the future in different ways.



The Department of Atomic Energy (DAE) has a long history of making
extravagant projections, none of which have been fulfilled despite
extravagant budgets. The trend started in 1954, when Homi Bhabha, the
founder of the nuclear program, announced that there would be 8,000
megawatts (MW) of nuclear power in the country by 1980. By 1960, the
prediction was that by 2000, there would be 43,500 MW. Reality, however, was
quite different. Actually installed capacity was about 600 MW in 1980 and
2,720 MW in 2000. In 1984, yet another atomic energy profile was announced
that visualized 10,000 MW by 2000. As the Comptroller and Auditor General of
India noted in its 1999 report, “Against the targeted additional power
generation of 940 MW by 1995-96, gradually increasing to 7880 MW by 2001 AD,
the actual additional generation of power under the profile as of March 1998
was nil in spite of having incurred an expenditure of 52.91 billion rupees.”
The trend has continued. In the early 2000s, the DAE projected that nuclear
power would constitute 275 GW by 2052; 20 percent of India’s total projected
electricity generation capacity. The latter has been increased to 470 GW
following the US-India nuclear deal. In light of the appalling history of
the DAE’s abilities to meet targets, such claims should be considered
implausible.



There is at least one good technical reason why these targets are unlikely
to be met. The DAE’s plans involve constructing hundreds of fast breeder
reactors; the much touted three stage nuclear program. Fast breeder reactors
are thus termed because they are based on energetic (fast) neutrons and
because they produce (breed) more fissile material than they consume. In the
early decades of nuclear power, many countries pursued breeder programs, but
practically all of them have given up on breeder reactors as unsafe and
uneconomical. In the words of Admiral Hyman Rickover, the founder of the
U.S. naval nuclear submarine program, his experiments with breeder reactors
showed that they were “expensive to build, complex to operate, susceptible
to prolong[ed] shutdown as a result of even minor malfunctions, and
difficult and time-consuming to repair.” Reliance on a technology shown to
be unreliable makes it likely that nuclear power will never become a major
source of electricity in India.



In addition, the DAE’s projections have simply not accounted properly for
the future availability of plutonium. To start with, the DAE will not have
enough plutonium for use as fuel by 2020 when it proposes to start on a
rapid expansion of breeders, and does not currently have enough reprocessing
capacity to handle all the spent fuel produced by the heavy water reactors
that are operating and under construction. Constructing new reprocessing
plants typically takes ten to fifteen years.



The DAE has also not taken into account the lag period between the time a
certain amount of plutonium is committed to a breeder reactor and when it
reappears along with additional plutonium for refuelling the same reactor,
thus contributing to the start-up fuel for a new breeder reactor. Instead,
the DAE used a flawed methodology that is only applicable to countries that
already have a very large nuclear reactor capacity and a large stockpile of
plutonium. These problems with the projected growth rates are not a matter
of differences in assumptions but plain impossibilities. In addition, the
DAE has resorted to various unrealistic assumptions about dealing with
radioactive spent fuel and recovering plutonium.



If one were to use a consistent methodology with more realistic assumptions,
the projected nuclear capacity would decrease to about 17 percent of the
DAE’s projections. Even this estimate assumes that there will be no delays
because of infrastructure and manufacturing problems, economic disincentives
due to the high cost of electricity, or accidents.



The limited amount of nuclear capacity built by the DAE has been expensive
compared to the staple source of electricity in the country: coal. Over the
decades, the DAE has made a number of claims about nuclear power’s
competitiveness with regard to coal powered thermal plants, provided one
went farther from coal mines, so as to add a substantial transportation
component to the cost of coal. The breakeven distance increased from about
six hundred km in the 1950s to 1,200 km in 1999. But when the costs of
generating electricity at the Kaiga Atomic Power Station and the Raichur
Thermal Power Station (RTPS) VII – both plants of similar size and vintage –
were compared with the coal for RTPS VII priced for a transportation
distance of 1,400 km, Kaiga proved competitive only for low discount rates.
Due to the multiple demands on capital for infrastructural projects,
including the demand for electricity generation, low discount rates are not
realistic. Breeder reactors turn out to be much more expensive – 80 percent
or more depending on the performance of the reactor – than electricity from
the heavy [water] reactors that the DAE has traditionally constructed.



A shift to imported light water reactors from the West brings with it a
dilemma, as these tend to be much more expensive to construct than the DAE’s
heavy water reactors. This would make nuclear electricity uncompetitive. If
the DAE were to insist on local manufacture of reactor components as a way
of leveraging India’s lower labor costs, then many of the construction
projects might only proceed slowly, as has been the case in the past.



The final factor, politics, at the grassroots levels, will be yet another
constraint to the expansion of nuclear power, as there has been significant
opposition to every new nuclear reactor and uranium [mine] that has been
planned since the 1980s. One setting where overwhelming opposition has been
recorded consistently has been at public consultations to discuss
environmental impact assessments of nuclear facilities, a necessary step for
any project to be accorded an environmental clearance. Unlike in the West,
though, the reasons have less to do with concerns about safety or
radioactive waste, though these do cause apprehension among locals. Rather,
because of the much greater dependence on natural resources like land and
water, the primary concern with nuclear facilities is their impact on lives
and livelihoods. In the case of reactors, for example, this is because their
requirements for cooling water and land compete with the needs of farmers,
and discharges of hot water and radioactive effluents into the sea affect
fish workers. Similar factors also drive opposition to large hydroelectric
dams, thermal power plants, and automobile factories. This will likely
intensify over the decades as land and other natural resources become
subject to tremendous competition.



Politics at the elite level, however, has a way of ignoring such local
opposition. Despite the recorded opposition at public consultations, for
example, every nuclear project has been granted environmental clearance. In
general, the DAE is a powerful organization and nuclear power has a special
attraction for the political and economic elite. This means that even if
nuclear power fails to deliver, it will continue to receive patronage. Thus,
even though nuclear power will only contribute modest amounts of electricity
to India’s energy needs for several decades at the very least, it will
continue to dominate policy discussions and receive large budgetary
allocations. This is unfortunate, as there are a number of sustainable
energy solutions that are being ignored for want of political interest and
financing.



*M. V. Ramana is Associate Research Scholar in the Program on Science and
Global Security at the Woodrow Wilson School of Public and International
Affairs, Princeton University. *

-- 
Peace Is Doable

-- 
You received this message because you are subscribed to the Google Groups 
"Green Youth Movement" group.
To post to this group, send an email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/greenyouth?hl=en-GB.

Reply via email to