["We (CAG) examined 216 projects in environment ministry granted
Environment Clearance (EC) between 2011-July 2015, for evaluating the
process of public consultation as stipulated in EIA Notification 2006.
In 196 projects where public consultation was to be conducted, we
found irregularities in 62 projects (32 %)," the CAG said.
It said due diligence process as prescribed in the EIA notification
for the conduct of public consultation was not followed in any of the
seven sectors including coal mining, industry, non coal mining,
construction, infrastructure, river valley and hydro electric projects
and thermal power.]

http://timesofindia.indiatimes.com/india/green-nods-given-to-projects-that-dont-meet-criteria/articleshow/57584746.cms

‘Green nods given to projects that don’t meet criteria’

TNN | Updated: Mar 11, 2017, 04.14 AM IST

NEW DELHI: Highlighting irregularities in the process of granting
green nods to many projects in the country, the Comptroller and
Auditor General of India (CAG) has noted that almost a third of the
nearly 200 developmental projects which got environmental clearances
between 2011-2015 did not adhere to the procedure of seeking mandatory
public consultation.

In its report, tabled in the Parliament on Friday, the CAG also said
that the existing processes for grant of environmental clearance in
the country suffered from various procedural deficiencies and there
were delays at each stage of environment impact assessment (EIA)
process.

It said the environmental clearances (EC) were granted to many
projects during the period "without checking the compliance
conditions" in the previous EC.

Referring to the mandatory public consultation process, the country's
central auditor noted that due diligence in process for holding public
consultation was not followed in seven sectors and the non-compliance
was maximum in case of river valley and hydro electric projects.

***"We (CAG) examined 216 projects in environment ministry granted
Environment Clearance (EC) between 2011-July 2015, for evaluating the
process of public consultation as stipulated in EIA Notification 2006.
In 196 projects where public consultation was to be conducted, we
found irregularities in 62 projects (32 %)," the CAG said.***
[Emphasis added.]

Latest Comment

Almost 70 years of independence and we still look at the sky and pray
to the rain gods to water our farm lands. Basic irritagtion
infrastructure not in place and we are thinking of bullet trains.
AD

***It said due diligence process as prescribed in the EIA notification
for the conduct of public consultation was not followed in any of the
seven sectors including coal mining, industry, non coal mining,
construction, infrastructure, river valley and hydro electric projects
and thermal power.*** [Emphasis added.]

"The non-compliance was maximum in case of river valley and hydro
electric projects," it said. The irregularities included delay in
conduct of public hearing, missing advertisements, advertisement not
in vernacular language, not taking views of public into account, among
others.

-- 
Peace Is Doable

-- 
You received this message because you are subscribed to the Google Groups 
"Green Youth Movement" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send an email to [email protected].
Visit this group at https://groups.google.com/group/greenyouth.
For more options, visit https://groups.google.com/d/optout.

Reply via email to