Ok, I'll branch shortly and we can start working on a 0.2 release.

Alan.

On Aug 19, 2011, at 1:27 PM, Thejas Nair wrote:

> +1 for going with 0.2 as first release.
> -Thejas
> 
> On 8/18/11 5:23 PM, Alan Gates wrote:
>> If we choose this course we can have a release candidate for 0.2 in 1-2 
>> days.  It takes 6 days minimum to do a vote cycle on a release.  So I think 
>> we can start practicing on 0.2 very soon, release better code, and not loose 
>> much time.
>> 
>> Alan.
>> 
>> On Aug 18, 2011, at 12:59 PM, Thejas Nair wrote:
>> 
>>> How long is it likely to take to get 0.2 to be release ready ? I wonder if 
>>> trying to get 0.1 out will be a good exercise in getting the legal files 
>>> and other related things setup correctly ?
>>> Otherwise, there might be more such cycles with 0.2 as well.
>>> 
>>> -Thejas
>>> 
>>> 
>>> 
>>> On 8/18/11 11:21 AM, Alan Gates wrote:
>>>> If you've been following our release votes in general@incubator you know 
>>>> that we have been unable to release hcat 0.1 due to issues with formatting 
>>>> of legal files, missing legal files, etc.  While our code for 0.1 has 
>>>> remained unchanged since June we still have been unable to release it.
>>>> 
>>>> In the meantime we have not stood still in terms of fixing bugs and adding 
>>>> features.  Rather than continuing to push two month old code I propose we 
>>>> abandon 0.1 and release 0.2.  We have already tagged a revision for it.  
>>>> We can branch from that tag and do a release from that branch.  I believe 
>>>> https://issues.apache.org/jira/browse/HCATALOG-53 should be fixed before 
>>>> we release.  This has been checked in post 0.2 tag, so we will need to 
>>>> port it to the branch.
>>>> 
>>>> Thoughts?
>>>> 
>>>> Alan.
>>> 
>> 
> 

Reply via email to