This 
<http://www.appropedia.org/images/6/66/6x8_H15_Hexayurt_instructional.pdf>H15 
guide shows tape-sealed edges only on the perimeter of the walls (2)

However this 
<http://www.appropedia.org/images/6/66/6x8_H15_Hexayurt_instructional.pdf>similar
 
H15 guide shows tape-sealed edges on every horizontal edge for the walls (4)

1) unless I'm missing something, these guides are basically exactly the 
same but one has staggered panels and the latter doesn't. So why would the 
tape sealing be different?

2) which one should we do if we're following the latter guide? I figure 
just follow the guide, but it requires 2x the tape and thus 2x the work. 
Which is fine, I just don't get why the guides differ regarding sealing

3) generally speaking, why do we tape seal some edges and not others? I get 
that it's a waste to, for example, tape seal the edges that will be hinges 
 (like the walls). But what about the roof, the line that separates the 
isoceles triangle?

Thanks for any thoughts.


-- 
You received this message because you are subscribed to the Google Groups 
"hexayurt" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/hexayurt.
For more options, visit https://groups.google.com/d/optout.

Reply via email to