Smoga ini menjadi salah satu enforcement positip bagi usaha migas di Indonesia. Kontraktor tidak hanya bisa janji-janji doank, kudu ada realisasi. Great !!!
RDP 06/21/08 03:25 Energy minister summons 25 oil contractors Jakarta (ANTARA News) - Energy and Mineral Resources Minister Purnomo Yusgiantoro on Friday summoned 25 oil contractors who had yet to meet their oil production targets as set in the revised 2008 State Budget. After meeting with the oil contractors, the minister said that most of them had not yet reached their production targets due to operational constraints. "We will assist them so that they can meet their production targets," the minister said. Among the oil contractors were PT Pertamina EP, BOB Pertamina-BSP, Kondur Petroleum, JOB PN-Golden Spike, Hess-Indonesia Pangkah, Klrez Energy, Kangean Energy Indonesia, Petroselat, Petrochina Bangko, Camar Resources Canada, JOB PN-Costa International Group, Medco EP Nus Lematang, Lapindo Brantas and Mobil Cepu Ltd. The minister said that of the 25 contractors, nine had achieved 95 percent of their production targets, 14 were still under 95 percent and two were still not in production. Yusgiantoro said the 25 oil contractors were part of the 37 oil contractor companies which had been in production. He said 12 other oil contractors had met their targets set at the revised 2008 state budget. "Although there are oil contractors which have not yet achieved their targets, we are optimistic that the overall production target set in the revised state budget at 977,000 barrels per day would be achieved," the minister said. Up to June 15, 2008, Indonesia`s oil and condensate production had reached 978,000 barrels per day. Yusbiantoro said that constraints being faced by the oil contractors included limited rigs, land overlapping and clearance, lack of production facilities, operational disturbance such as damage to compressors, power cuts and infrastructure facilities. Last week, President Susilo Bambang Yudhoyono and Vice President Jusuf Kalla held a closed-door meeting with top executives of gas and oil companies. "Issues related with oil and gas were discussed in the meeting. President Yudhoyono explained that the Indonesian government has made a series of efforts at international level to respond to current developments in the energy situation," Yusgiantoro said. (*) COPYRIGHT (c) 2008 -- http://tempe.wordpress.com/ Telling the truth is important Telling the positive is better !!! -------------------------------------------------------------------------------- PIT IAGI KE-37 (BANDUNG) * acara utama: 27-28 Agustus 2008 * penerimaan abstrak: kemarin2 s/d 30 April 2008 * pengumuman penerimaan abstrak: 15 Mei 2008 * batas akhir penerimaan makalah lengkap: 15 Juli 2008 * abstrak / makalah dikirimkan ke: www.grdc.esdm.go.id/aplod username: iagi2008 password: masukdanaplod -------------------------------------------------------------------------------- PEMILU KETUA UMUM IAGI 2008-2011: * pendaftaran calon ketua: 13 Pebruari - 6 Juni 2008 * penghitungan suara: waktu PIT IAGI Ke-37 di Bandung AYO, CALONKAN DIRI ANDA SEKARANG JUGA!!! ----------------------------------------------------------------------------- To unsubscribe, send email to: iagi-net-unsubscribe[at]iagi.or.id To subscribe, send email to: iagi-net-subscribe[at]iagi.or.id Visit IAGI Website: http://iagi.or.id Pembayaran iuran anggota ditujukan ke: Bank Mandiri Cab. Wisma Alia Jakarta No. Rek: 123 0085005314 Atas nama: Ikatan Ahli Geologi Indonesia (IAGI) Bank BCA KCP. Manara Mulia No. Rekening: 255-1088580 A/n: Shinta Damayanti IAGI-net Archive 1: http://www.mail-archive.com/iagi-net%40iagi.or.id/ IAGI-net Archive 2: http://groups.yahoo.com/group/iagi --------------------------------------------------------------------- DISCLAIMER: IAGI disclaims all warranties with regard to information posted on its mailing lists, whether posted by IAGI or others. In no event shall IAGI and its members be liable for any, including but not limited to direct or indirect damages, or damages of any kind whatsoever, resulting from loss of use, data or profits, arising out of or in connection with the use of any information posted on IAGI mailing list. ---------------------------------------------------------------------

