I've read the Message but that doesn't recommend 1 cyl PLPA. I've also seen
in a couple of other manuals that it can be ignored. I am still searching
the Performance Manual and the ABC's for this recommendation.
Thanks,
Craig
-----Original Message-----
From: IBM Mainframe Discussion List [mailto:[EMAIL PROTECTED] On Behalf
Of Martin Kline
Sent: Monday, July 25, 2005 2:01 PM
To: [email protected]
Subject: Re: ILR005E PLPA PAGE DATA SET FULL
> Is that recommendation in an IBM manual so that it
satisfies management?
I know it's common practice to ignore the message, and we do it here, but
this is what IBM has to say in the messages manual for z/OS 1.4:
If both PLPA and COMMON page data sets are on the same volume, and
have been allocated in contiguous extents with the PLPA data set
allocated first on the volume, this message can be ignored as long a
enough COMMON page data set space has been allocated to contain both
PLPA and COMMON pages.
If the PLPA and COMMON page sets are on the same volume, and their
allocated extents are not contiguous, they should be reallocated in
contiguous extents, or the PLPA data set should be increased in size
large enough to hold all LPA pages and moved to another volume.
If the PLPA and COMMON page data sets are on different volumes, you
should increase the size of the PLPA page data set prior to the next
IPL.
CONFIDENTIALITY NOTICE: This electronic transmission (including any
accompanying attachments) is intended solely for its authorized
recipient(s), and may contain confidential and/or legally privileged
information. If you are not an intended recipient, or responsible for
delivering some or all of this transmission to an intended recipient, be
aware that any review, copying, printing, distribution, use or disclosure of
the contents of this message is strictly prohibited. If you have received
this electronic message in error, please contact us immediately by
electronic mail at [EMAIL PROTECTED] or notify us
immediately by telephone at 1-800-345-2021 or 816-531-5575 and destroy the
original and all copies of this transmission (including any attachments).
Thank you.
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html