Hi,
We have two ESS800 in two locations with PPRC v2. We plan to power-off ESS_A (primary) for realocation (1-2 hours). For this period of time system and application will be stopped. During this time we don’t plan to start system in secondary location, so there will be no update on ESS_B

I’m looking for a safe procedure to power-off ESS_A with existing PPRC and I don’t want to perform ‘initial copy’ after procedure.


--
MARCIN BLASZCZYK

email: [EMAIL PROTECTED]

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to