We have two lpars that perform the vast majority of our batch work. CA7 runs 
on one of these lpars and most of the CA7 submitted jobs are picked up by the 
JES2 on that system. This leaves the other system almost empty of batch work 
while the first system is being over loaded.

What are some of our options to spread the workload across both systems on an 
equal basis.

zOS 1.4. JES2 managed batch. Thruput manager is available.

Thanks.
-- 

Mark Jacobs
Time Customer Service
Tampa, FL

-----------------------------

b.i.b.a.w.y.l.o. and i.w.w.y.t.b.w.

Brian Smith to his wife Maureen 
To Sail Beyond the Sunset

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to