You are thinking back to the days when UCC1 zapped IBM O/C/EOV modules
instead of using SVCs and exit points to install their code. With zaps
you MUST have the correct level of IBM code so pre-req entries were
required.


Jon L. Veilleux
[EMAIL PROTECTED]
(860) 636-2683 

 
 
My experience must predate Tom's - I certainly do remember UCC-1
maintenance PRE-ing IBM PTFs (for Open/Close/EOV/etc.).  However, that
was a long, long, long time ago and Russell's current methods might well
no longer need that.  I do not, for example, recall having PTF issues
with CA-
1 in the slightly more recent past.  And I am not now a CA-1 customer so
I
(a) can't say and (b) don't have a vote.  
 
But if Russell believes he can ship working code with or without SMP/E,
I believe him.  
 
My present work location has contract requirements that ALL software
must be installed via SMP/E (if SMP/E is at all an option).  Software
that is not available via SMP/E is generally not allowed here.  
 
--
Tom Schmidt
Madison, WI 
 

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send
email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search
the archives at http://bama.ua.edu/archives/ibm-main.html

-----------------------------------------
This e-mail may contain confidential or privileged information. If
you think you have received this e-mail in error, please advise the
sender by reply e-mail and then delete this e-mail immediately.
Thank you. Aetna

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to