You are thinking back to the days when UCC1 zapped IBM O/C/EOV modules instead of using SVCs and exit points to install their code. With zaps you MUST have the correct level of IBM code so pre-req entries were required.
Jon L. Veilleux [EMAIL PROTECTED] (860) 636-2683 My experience must predate Tom's - I certainly do remember UCC-1 maintenance PRE-ing IBM PTFs (for Open/Close/EOV/etc.). However, that was a long, long, long time ago and Russell's current methods might well no longer need that. I do not, for example, recall having PTF issues with CA- 1 in the slightly more recent past. And I am not now a CA-1 customer so I (a) can't say and (b) don't have a vote. But if Russell believes he can ship working code with or without SMP/E, I believe him. My present work location has contract requirements that ALL software must be installed via SMP/E (if SMP/E is at all an option). Software that is not available via SMP/E is generally not allowed here. -- Tom Schmidt Madison, WI ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html ----------------------------------------- This e-mail may contain confidential or privileged information. If you think you have received this e-mail in error, please advise the sender by reply e-mail and then delete this e-mail immediately. Thank you. Aetna ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html

