> >Lastly, it will take longer for things to time-out that are waiting > for some event to occur (such as tape mounts). > > 1: I would not want Production to ever fail on a tape mount. I'd > rather wait than restart. > > 2: With Virtual tape, how long is a mount?
When I first arrived the UTL used to extend prod jobs unconditionally. Found some of the jobs still waiting next morning. So I changed it to fail the job after 5 extensions (of 30 mins), and cut an SMF record. Problem reports started appearing. After that the ops "stayed awake"; problem fixed. Virtual tape is *great*. Shane ... ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html

