> >Lastly, it will take longer for things to time-out that are waiting
> for some event to occur (such as tape mounts).
>
> 1: I would not want Production to ever fail on a tape mount. I'd
> rather wait than restart.
>
> 2: With Virtual tape, how long is a mount?

When I first arrived the UTL used to extend prod jobs unconditionally.
Found some of the jobs still waiting next morning.
So I changed it to fail the job after 5 extensions (of 30 mins), and cut an
SMF record.

Problem reports started appearing.
After that the ops "stayed awake"; problem fixed.

Virtual tape is *great*.

Shane ...

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to