On Mon, 6 Nov 2006 16:14:21 -0000 Phil Payne
<[EMAIL PROTECTED]> wrote:

:>> Maybe the program was converted from VSE which, in the days when it was
:>DOS anyhow, used an SVC macro to "end the job".

:>So, effectively, does z/OS.  ISTR that R14 in a jobstep programme points
:>directly at an SVC 3 instruction.   You used to be able to tell if you were
:>the jobstep programme by looking at that.

When?

AFAIR R14 always pointed to SVC3 when supervisor assisted linkage, i.e. either
LINK or ATTACH, was used.

--
Binyamin Dissen <[EMAIL PROTECTED]>
http://www.dissensoftware.com

Director, Dissen Software, Bar & Grill - Israel


Should you use the mailblocks package and expect a response from me,
you should preauthorize the dissensoftware.com domain.

I very rarely bother responding to challenge/response systems,
especially those from irresponsible companies.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to