Eric Bielefeld pisze:
I just read through a lot of the announcement letter from the link quoted below. This sounds very interesting. I don't know what the FICON Express8 channels cost, but I know if you just bought your machine, and you decide you need those channels, you it will probably cost a lot to convert. I know the last company I contracted for just got their z/10 BC several weeks ago, so I'm sure they won't have the new channels. The also were running z/OS V1.7 when I left.

One thing from the announcement letter puzzled me. This is from the Software Requirements section, refering to the z/OS v1.7 Lifecycle Extension:

"IBM Lifecycle Extension for z/OS V1.7:z/OS V1.7 support was withdrawn September 30, 2008. The Lifecycle Extension for z/OS V1.7 (5637-A01) makes fee-based corrective service for z/OS V1.7 available through September 2010. With the Lifecycle Extension, z/OS V1.7 supports the System z10 servers (z10 EC, z10 BC). Certain functions and features of the z10 servers require later releases of z/OS. For the complete list of software support, see the PSP buckets. For more information on the IBM Lifecycle Extension for z/OS V1.7, refer to Software Announcement 208-283, dated August 12, 2008."

I know we had a discussion about the Lifecycle extension some time ago, and a few people chimed in and said they weren't paying for the Lifecycle Extension. They just put on all of the PTFs from the PSP buckets and things worked fine. This was so you could run a z10 machine using z/OS V1.7. I'm not sure what the quoted paragraph above says. Do you have to pay for the Lifecycle Extension to be able to use these new channels to get the maintenance, or can you just pull the PSP buckets? I guess I'm just curious. I think curiosity is one attribute that makes a good sysprog.

Does anyone think they will upgrade their z/10 to use the new channels? I imagine the channels are just the first step. To fully utilize the channels, you need to replace all your I/O gear, although it sounds like there are some benefits with the new channels even without updating your disk or tape drives.

Eric,
I don't think the new channels will be significantly more expensive. Of course the change will be paid.

Last but not least:
- you don't need the channels if you don't have 8Gbps on the other end of cable. I mean CU or switch for shared channels (rather theoretical scenario - fully loade channel and multiple CUs connected). - you don't need the channels if your current utilization is reasonably low. From my limited experience - I have never observed >50% utilization on my FiconEx4 channels connected to 4Gbps capable DASD CU. I use 4 channels, more port are available at both ends.

So, in my case I don't expect Ficon Express8 channels before z11 arrives here. Good for current economy <g>
--
Radoslaw Skorupka
Lodz, Poland


--
BRE Bank SA
ul. Senatorska 18
00-950 Warszawa
www.brebank.pl

Sd Rejonowy dla m. st. Warszawy XII Wydzia Gospodarczy Krajowego Rejestru Sdowego, nr rejestru przedsibiorców KRS 0000025237
NIP: 526-021-50-88
Wedug stanu na dzie 01.01.2009 r. kapita zakadowy BRE Banku SA (w caoci 
wpacony) wynosi 118.763.528 zotych. W zwizku z realizacj warunkowego 
podwyszenia kapitau zakadowego, na podstawie uchway XXI WZ z dnia 16 marca 
2008r., oraz uchway XVI NWZ z dnia 27 padziernika 2008r., moe ulec 
podwyszeniu do kwoty 123.763.528 z. Akcje w podwyszonym kapitale zakadowym 
BRE Banku SA bd w caoci opacone.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to