<snip> 3) The LPAR involved runs on a 2817-503, so a 3 CP, 204 MSU z196, of which I want to give and limit 2 MSU to CICS Devl/Acc. 2000000 SU/hr = 555 SU/sec. I also tried 3 CP percents (option 3) which also equals 2 MSU (204/3*.03=2) but this gives similar results. WLM is not willing to cut the users in the RG to the desired consumption. </snip>
In that case, I can only suggest opening an issue w/IBM or using the empirical method. i.e. adjust the RG value until the desired results are achieved. HTH, ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [email protected] with the message: INFO IBM-MAIN
