On Thu, 18 Jul 2013 10:59:52 +0200, Beate Kawelke wrote: > > >Is there a way to "release" / "ignore" that connection (I have looked through >the DYNALLOC parameters, but to no avail) or do I have to go through the >catalog and use my own logic to determine the correct DSN? ISPF Edit, much to >my surprise, gets it right - if I specify generation 0, the new dataset will >be found. >
http://www-01.ibm.com/support/docview.wss?uid=isg1II08285 "Note: Dynamic allocations can turn on bit S99GDGNT to bypass using the table and thus always locate the current entry (generation 0) at the time of the allocation. This allows them always to know the current generation, even when this job (or another job), running on the same system (or a different system, as long as the catalog is shared between systems) has added generations since this job began." Norbert Friemel ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [email protected] with the message: INFO IBM-MAIN
