The Track-managed deals with the first 64K cylinders.  The other one
deals with the EAV 21 Cylinder managed portion past the first 64K
cylinders.

On Tue, Feb 27, 2018 at 8:55 AM, willie bunter
<[email protected]> wrote:
> Good Day To All,
>
> I am trouble shooting a problem caused by space abends.  I looked at all of 
> the 54 SMS managed volumes
>
> (via ISPF 3.4) and  I found 2,930 dsns which are allocated on this specific 
> Storage Group which were created in Dec.2017 and have not been referenced 
> since their creation.
> According to the Management class, the dsns are to be deleted after 2 days of 
> non reference.  Primary and Secondary Space management are run daily on this 
> Storage Group.  Since the threshold requirements are being met, SMS does not 
> process some of these volumes.  I was thinking of lowering the threshold in 
> order to get SMS to select most of the volumes when Space management is run.
>
> My question is do I modify the Allocation/migration Threshold or the 
> Alloc/Migr Threshold Track-Managed.
>
> Below is threshold settings:
> Allocation/migration Threshold :                       High    85      
> (1-100)  Low . . 1   (0-99)
> Alloc/Migr Threshold Track-Managed:                    High    85      
> (1-100)  Low . . 1   (0-99)
>
> Thanks in advance for your suggestions.
>
> ----------------------------------------------------------------------
> For IBM-MAIN subscribe / signoff / archive access instructions,
> send email to [email protected] with the message: INFO IBM-MAIN



-- 
Mike A Schwab, Springfield IL USA
Where do Forest Rangers go to get away from it all?

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN

Reply via email to