The Track-managed deals with the first 64K cylinders. The other one deals with the EAV 21 Cylinder managed portion past the first 64K cylinders.
On Tue, Feb 27, 2018 at 8:55 AM, willie bunter <[email protected]> wrote: > Good Day To All, > > I am trouble shooting a problem caused by space abends. I looked at all of > the 54 SMS managed volumes > > (via ISPF 3.4) and I found 2,930 dsns which are allocated on this specific > Storage Group which were created in Dec.2017 and have not been referenced > since their creation. > According to the Management class, the dsns are to be deleted after 2 days of > non reference. Primary and Secondary Space management are run daily on this > Storage Group. Since the threshold requirements are being met, SMS does not > process some of these volumes. I was thinking of lowering the threshold in > order to get SMS to select most of the volumes when Space management is run. > > My question is do I modify the Allocation/migration Threshold or the > Alloc/Migr Threshold Track-Managed. > > Below is threshold settings: > Allocation/migration Threshold : High 85 > (1-100) Low . . 1 (0-99) > Alloc/Migr Threshold Track-Managed: High 85 > (1-100) Low . . 1 (0-99) > > Thanks in advance for your suggestions. > > ---------------------------------------------------------------------- > For IBM-MAIN subscribe / signoff / archive access instructions, > send email to [email protected] with the message: INFO IBM-MAIN -- Mike A Schwab, Springfield IL USA Where do Forest Rangers go to get away from it all? ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [email protected] with the message: INFO IBM-MAIN
