I would suggest that you define 3 guest machines on your z/VM 5.2. Run your VSE/ESA 2.6.3 systems in two of them and your VM/ESA 2.4 system in the third. You will get much better performance that way than running the VSEs third level.

Dan Andrada wrote:
Thanks for the input everyone!

We're looking at getting off our 9221 box running VM/ESA 2.4 and VSE/ESA 2.6.3. We have merely two VSE guest machines and just a handful of programmers that use CMS for developemnt purposes. No Linux, no production VM guest machines other than the VSE guests. In our shop, VM is merely a "hyper-visor" for our VSE guests. However, our programming staff does not want to lose the various EXEC's they use in CMS and XEDIT.

We have a proposal to move to a z/890 processor to run z/VM and z/VSE to stay in support. To ease our migration, I would like to bring up VM/ESA 2.4 as a second-level guest along with one or both of the VSE guests under that, and progress from there. Even at the entry level configuration of a z/890, its processing capacity is easily twice that of our current 9221 utilization, so I don't think I need to be too concerned about processing overhead.

I've asked IBM about this and I've not been given a definitive answer. The latest FAQ that IBM has provided on their z/VM site states that z/VM will run VSE/ESA and VM/ESA as guests. The "Tell-All" for me would be to find out if anyone has attempted or done this kind of migration.

So with that said, if anyone has any further information or experience in doing a migration of this type, I would be very grateful for your input.

Thanks again!



--
Stephen Frazier
Information Technology Unit
Oklahoma Department of Corrections
3400 Martin Luther King
Oklahoma City, Ok, 73111-4298
Tel.: (405) 425-2549
Fax: (405) 425-2554
Pager: (405) 690-1828
email:  stevef%doc.state.ok.us

Reply via email to