With a small change to my BUSERVER, ICKDSF TRKFMT commands could be
dispatched to 1 to 99 worker machines.

2008/12/8 Alain Benveniste <[EMAIL PROTECTED]>

> Mary,
>
> TRKFMT is very slow process.
> We have to wipe out our DR site at each test. Cycle for us is 3.
> To do that I have developped something around DUPLICATE HiDRO cmd. The idea
> is to TRKFMT volume A, B and C (3 cycles). Then we duplicate A to A', B to
> B' and C to C' and again A to A", A to B" and C to C". Then I use each pack
> of 3 to create the duplicate cmds. Then I give it to eat to HiDRO.
> HiDRO is able to run concurrent tasks (99 max). I remember that using
> TRKFMT
> with a cyle of 3 took half a week. With this method it took 3h45.
>
> Alain Benveniste
>
>
>
> Le 8/12/08 15:52, « Mary Zervos » <[EMAIL PROTECTED]> a écrit :
>
> > We are about to retire a 2105-F20 Shark, which will be resold.  The best
> > way to totally delete all our data from the Shark?
> >
> > Thanks,
> >
> > Mary Zervos
> > Systems Programmer
> > Binghamton University
> >
>



-- 
Kris Buelens,
IBM Belgium, VM customer support

Reply via email to