With a small change to my BUSERVER, ICKDSF TRKFMT commands could be dispatched to 1 to 99 worker machines.
2008/12/8 Alain Benveniste <[EMAIL PROTECTED]> > Mary, > > TRKFMT is very slow process. > We have to wipe out our DR site at each test. Cycle for us is 3. > To do that I have developped something around DUPLICATE HiDRO cmd. The idea > is to TRKFMT volume A, B and C (3 cycles). Then we duplicate A to A', B to > B' and C to C' and again A to A", A to B" and C to C". Then I use each pack > of 3 to create the duplicate cmds. Then I give it to eat to HiDRO. > HiDRO is able to run concurrent tasks (99 max). I remember that using > TRKFMT > with a cyle of 3 took half a week. With this method it took 3h45. > > Alain Benveniste > > > > Le 8/12/08 15:52, « Mary Zervos » <[EMAIL PROTECTED]> a écrit : > > > We are about to retire a 2105-F20 Shark, which will be resold. The best > > way to totally delete all our data from the Shark? > > > > Thanks, > > > > Mary Zervos > > Systems Programmer > > Binghamton University > > > -- Kris Buelens, IBM Belgium, VM customer support
