I have no extra disk, no tape, but still need a fallback, I am thinking of 
implementing the following strategy to put maintenance into production and 
would appreciate it, if someone could find something wrong.

My 2d Level is a mirror of 1st Level except for VOLSERs which are unique.

I apply maintenance to 2d Level.

Maintenance hits 5 SDFs, among them, CMS.

At cutover:  I simply point to the 2d Level RES and IPL it from the HMC.

I bring up what was the 1st Level at 2d Level, after making the 
appropriate VOLSER changes for the 2d Level machine in the 1st Level 
Directory.

I  then have my prevous 1st Level machine at 2d Level as a fallback, if 
need be.

When I am ready to install a new version or put on more maintenance,, I 
DDR the 1st Level disks to the 2d Level, and bgin the process all over 
again.

Aside from losing the 1st Level Spool files whenever I do this, I see no 
other problem.

I suppose I could always connect the 2d Level and 1st Level Spools with 
RSCS so I do not have that problem.

I could also use Dave Jones, *handy dandy* SFB utility to copy the Spool 
files to CMS and then  restore them to the new 1st Level system.

But aside from this weakness, I see no other reason why this should not 
work. 

Please, someone, let me know if you do.

Reply via email to