As long as the CMS users are not on the System Vols:  540RES, 540W01, 
540W02, I should be ok because the Level 2 directory is identical to the 
Level 1 directory except for these VOLSERs.

The same should be true for DB2, DIRMAINT, VMSECURE, etc.

As long as none of these things are on these 3 VOLSERs, it should be 
transparent to the migration.

If they are on these VOLSERs, they should not be for this very reason, and 
should be migrated off.





Michael Coffin <[email protected]> 
Sent by: The IBM z/VM Operating System <[email protected]>
10/18/2010 05:16 PM
Please respond to
The IBM z/VM Operating System <[email protected]>


To
[email protected]
cc

Subject
Re: *Rolling IPL* Style Migration






Hi George,
 
If you are only using z/VM as a hypervisor for Linux guests (or otherwise 
don’t have an active CMS user community) this will work.  If you have 
servers (e.g. DB2, SFS, etc.) and/or end-users that are updating CMS files 
– you have to keep in mind that those will get out of sync on your 2nd 
level system right after the spindles are copied.  If you have directory 
maintenance products (e.g. VM:Secure, DIRMAINT,etc.) and/or an ESM (e.g. 
VM:Secure, RACF, etc.) these products will also get out of sync, so find a 
way to ensure they stay synchronized between first and 2nd level systems. 
 
-Mike
 
From: The IBM z/VM Operating System [mailto:[email protected]] On 
Behalf Of George Henke/NYLIC
Sent: Monday, October 18, 2010 4:53 PM
To: [email protected]
Subject: *Rolling IPL* Style Migration
 

I have no extra disk, no tape, but still need a fallback, I am thinking of 
implementing the following strategy to put maintenance into production and 
would appreciate it, if someone could find something wrong. 

My 2d Level is a mirror of 1st Level except for VOLSERs which are unique. 

I apply maintenance to 2d Level. 

Maintenance hits 5 SDFs, among them, CMS. 

At cutover:  I simply point to the 2d Level RES and IPL it from the HMC. 

I bring up what was the 1st Level at 2d Level, after making the 
appropriate VOLSER changes for the 2d Level machine in the 1st Level 
Directory. 

I  then have my prevous 1st Level machine at 2d Level as a fallback, if 
need be. 

When I am ready to install a new version or put on more maintenance,, I 
DDR the 1st Level disks to the 2d Level, and bgin the process all over 
again. 

Aside from losing the 1st Level Spool files whenever I do this, I see no 
other problem. 

I suppose I could always connect the 2d Level and 1st Level Spools with 
RSCS so I do not have that problem. 

I could also use Dave Jones, *handy dandy* SFB utility to copy the Spool 
files to CMS and then  restore them to the new 1st Level system. 

But aside from this weakness, I see no other reason why this should not 
work. 

Please, someone, let me know if you do. 