How long should the jib sheet be for a 1984 standard rig with a roller furling and a 135 jib?
I am also installing a whisker pole eye...what is a good height for a single point attachement? I am also converting to internal halyards where (what height from the mast base) should the exit blocks be located? Thanks - Joe
