Bisa gak di share masalahnya apa? jadi rekan2 bisa tau & belajar juga :)
On 5/23/07, Herry Yusirwan <[EMAIL PROTECTED]> wrote: > > Enterprise manager saya sudah 'hidup' kembali... > > Terima kasih kepada rekan2 yang telah membantu... > > Rgds, > > Herry > > ________________________________ > > From: [email protected] <indo-oracle%40yahoogroups.com> [mailto: > [email protected] <indo-oracle%40yahoogroups.com>] > On Behalf Of Herry Yusirwan > Sent: Wednesday, May 23, 2007 12:21 PM > To: [email protected] <indo-oracle%40yahoogroups.com> > Subject: RE: [indo-oracle] enterprise manager ga bisa 'hidup' > > Oke, pak... > > ________________________________ > > From: [email protected] <indo-oracle%40yahoogroups.com> <mailto: > indo-oracle%40yahoogroups.com> > [mailto:[email protected] <indo-oracle%40yahoogroups.com> > <mailto:indo-oracle%40yahoogroups.com> ] > On Behalf Of Yoel Susanto > Sent: Wednesday, May 23, 2007 11:52 AM > To: [email protected] <indo-oracle%40yahoogroups.com> <mailto: > indo-oracle%40yahoogroups.com> > > Subject: Re: [indo-oracle] enterprise manager ga bisa 'hidup' > > Ya mbok di coba diliat di log filenya....khan sudah di kasih tau itu.. > > Refer to the log file at > C:\oracle\product\10.2.0\db_1\cfgtoollogs\emca\dev01\emca_2007-05-23_10- > 54-50-AM.log for more details. > > On 5/23/07, Herry Yusirwan <[EMAIL > PROTECTED]<herry.yusirwan%40indonesiapower.co.id> > <mailto:herry.yusirwan%40indonesiapower.co.id> > <mailto:herry.yusirwan%40indonesiapower.co.id> > wrote: > > > > Saya sudah menjalankan yang bapak infokan... > > > > Hasil akhirnya error. Hasilnya seperti ini: > > > > Do you wish to continue? [yes(Y)/no(N)]: y > > > > May 23, 2007 10:55:56 AM oracle.sysman.emcp.EMConfig perform > > > > INFO: This operation is being logged at > > C:\oracle\product\10.2.0\db_1\cfgtoollog > > > > s\emca\dev01\emca_2007-05-23_10-54-50-AM.log. > > > > May 23, 2007 10:55:57 AM oracle.sysman.emcp.util.DBControlUtil stopOMS > > > > INFO: Stopping Database Control (this may take a while) ... > > > > May 23, 2007 10:55:58 AM oracle.sysman.emcp.EMReposConfig > dropRepository > > > > INFO: Dropping the EM repository (this may take a while) ... > > > > May 23, 2007 10:56:19 AM oracle.sysman.emcp.EMReposConfig invoke > > > > INFO: Repository successfully dropped > > > > May 23, 2007 10:56:19 AM oracle.sysman.emcp.EMReposConfig > > createRepository > > > > INFO: Creating the EM repository (this may take a while) ... > > > > May 23, 2007 10:56:19 AM oracle.sysman.emcp.EMReposConfig invoke > > > > SEVERE: Error creating the repository > > > > May 23, 2007 10:56:19 AM oracle.sysman.emcp.EMReposConfig invoke > > > > INFO: Refer to the log file at > > C:\oracle\product\10.2.0\db_1\cfgtoollogs\emca\de > > > > v01\emca_repos_create_<date>.log for more details. > > > > May 23, 2007 10:56:19 AM oracle.sysman.emcp.EMConfig perform > > > > SEVERE: Error creating the repository > > > > Refer to the log file at > > C:\oracle\product\10.2.0\db_1\cfgtoollogs\emca\dev01\em > > > > ca_2007-05-23_10-54-50-AM.log for more details. > > > > Could not complete the configuration. Refer to the log file at > > C:\oracle\product > > > > \10.2.0\db_1\cfgtoollogs\emca\dev01\emca_2007-05-23_10-54-50-AM.log > for > > more det > > > > ails. > > > > Kira2 kenapa? > > > > Terima kasih > > > > Rgds, > > > > Herry > > > > DISCLAIMER: > > This Message is confidential; it contents does not constitute a > commitment > > by PT. INDONESIA POWER, except where provided for in a written > agreement > > between you and PT. INDONESIA POWER. Any unauthorized disclosure, use > or > > dissemination of the content, either whole or partial, is strictly > > prohibited. If you are not the intended recipient of the message or > you have > > received this electronic transmission in error, please notify or > contact the > > sender immediately. > > > > PT.INDONESIA POWER is subsidiary of PT. PLN PERSERO which operates in > > power generating business. Through its 130 power plants, with a total > > capacity of 8,872 MW, PT.INDONESIA POWER has contributed significantly > to > > the Java Bali interconnection system electricity supply. > PT.INDONESIAPOWER operates through its eight generating Business Unit > (GBU) : Suralaya, > > Priok, Saguling, Kamojang, Mrica, Semarang, Perak Grati, Bali and one > > maintenance Services business unit (MSBU). > > > > [Non-text portions of this message have been removed] > > > > > > > > [Non-text portions of this message have been removed] > > DISCLAIMER: > This Message is confidential; it contents does not constitute a > commitment by PT. INDONESIA POWER, except where provided for in a > written agreement between you and PT. INDONESIA POWER. Any unauthorized > disclosure, use or dissemination of the content, either whole or > partial, is strictly prohibited. If you are not the intended recipient > of the message or you have received this electronic transmission in > error, please notify or contact the sender immediately. > > PT.INDONESIA POWER is subsidiary of PT. PLN PERSERO which operates in > power generating business. Through its 130 power plants, with a total > capacity of 8,872 MW, PT.INDONESIA POWER has contributed significantly > to the Java Bali interconnection system electricity supply. PT.INDONESIA > POWER operates through its eight generating Business Unit (GBU) : > Suralaya, Priok, Saguling, Kamojang, Mrica, Semarang, Perak Grati, Bali > and one maintenance Services business unit (MSBU). > > [Non-text portions of this message have been removed] > > DISCLAIMER: > This Message is confidential; it contents does not constitute a commitment > by PT. INDONESIA POWER, except where provided for in a written agreement > between you and PT. INDONESIA POWER. Any unauthorized disclosure, use or > dissemination of the content, either whole or partial, is strictly > prohibited. If you are not the intended recipient of the message or you have > received this electronic transmission in error, please notify or contact the > sender immediately. > > PT.INDONESIA POWER is subsidiary of PT. PLN PERSERO which operates in > power generating business. Through its 130 power plants, with a total > capacity of 8,872 MW, PT.INDONESIA POWER has contributed significantly to > the Java Bali interconnection system electricity supply. PT.INDONESIAPOWER > operates through its eight generating Business Unit (GBU) : Suralaya, > Priok, Saguling, Kamojang, Mrica, Semarang, Perak Grati, Bali and one > maintenance Services business unit (MSBU). > > [Non-text portions of this message have been removed] > > > [Non-text portions of this message have been removed]

