Sepertinya error yang terjadi karena koneksi listenernya yang tidak bisa
konek dengan menggunakan @dbname.

Saya perbaiki itu terlebih dahulu, setelah itu saya jalankan perintah :
$ emca -config dbcontrol db -repos recreate

Dan akhirnya berhasil...

 

Terima kasih

 

Rgds,

Herry

 

 

________________________________

From: [email protected] [mailto:[EMAIL PROTECTED]
On Behalf Of Yoel Susanto
Sent: Wednesday, May 23, 2007 10:26 PM
To: [email protected]
Subject: Re: [indo-oracle] enterprise manager ga bisa 'hidup'

 

Bisa gak di share masalahnya apa?
jadi rekan2 bisa tau & belajar juga :)

On 5/23/07, Herry Yusirwan <[EMAIL PROTECTED]
<mailto:herry.yusirwan%40indonesiapower.co.id> > wrote:
>
> Enterprise manager saya sudah 'hidup' kembali...
>
> Terima kasih kepada rekan2 yang telah membantu...
>
> Rgds,
>
> Herry
>
> ________________________________
>
> From: [email protected]
<mailto:indo-oracle%40yahoogroups.com>  <indo-oracle%40yahoogroups.com>
[mailto:
> [email protected] <mailto:indo-oracle%40yahoogroups.com>
<indo-oracle%40yahoogroups.com>]
> On Behalf Of Herry Yusirwan
> Sent: Wednesday, May 23, 2007 12:21 PM
> To: [email protected] <mailto:indo-oracle%40yahoogroups.com>
<indo-oracle%40yahoogroups.com>
> Subject: RE: [indo-oracle] enterprise manager ga bisa 'hidup'
>
> Oke, pak...
>
> ________________________________
>
> From: [email protected]
<mailto:indo-oracle%40yahoogroups.com>  <indo-oracle%40yahoogroups.com>
<mailto:
> indo-oracle%40yahoogroups.com>
> [mailto:[email protected]
<mailto:indo-oracle%40yahoogroups.com>  <indo-oracle%40yahoogroups.com>
> <mailto:indo-oracle%40yahoogroups.com> ]
> On Behalf Of Yoel Susanto
> Sent: Wednesday, May 23, 2007 11:52 AM
> To: [email protected] <mailto:indo-oracle%40yahoogroups.com>
<indo-oracle%40yahoogroups.com> <mailto:
> indo-oracle%40yahoogroups.com>
>
> Subject: Re: [indo-oracle] enterprise manager ga bisa 'hidup'
>
> Ya mbok di coba diliat di log filenya....khan sudah di kasih tau itu..
>
> Refer to the log file at
>
C:\oracle\product\10.2.0\db_1\cfgtoollogs\emca\dev01\emca_2007-05-23_10-
> 54-50-AM.log for more details.
>
> On 5/23/07, Herry Yusirwan <[EMAIL PROTECTED]
<mailto:herry.yusirwan%40indonesiapower.co.id>
<herry.yusirwan%40indonesiapower.co.id>
> <mailto:herry.yusirwan%40indonesiapower.co.id>
> <mailto:herry.yusirwan%40indonesiapower.co.id> > wrote:
> >
> > Saya sudah menjalankan yang bapak infokan...
> >
> > Hasil akhirnya error. Hasilnya seperti ini:
> >
> > Do you wish to continue? [yes(Y)/no(N)]: y
> >
> > May 23, 2007 10:55:56 AM oracle.sysman.emcp.EMConfig perform
> >
> > INFO: This operation is being logged at
> > C:\oracle\product\10.2.0\db_1\cfgtoollog
> >
> > s\emca\dev01\emca_2007-05-23_10-54-50-AM.log.
> >
> > May 23, 2007 10:55:57 AM oracle.sysman.emcp.util.DBControlUtil
stopOMS
> >
> > INFO: Stopping Database Control (this may take a while) ...
> >
> > May 23, 2007 10:55:58 AM oracle.sysman.emcp.EMReposConfig
> dropRepository
> >
> > INFO: Dropping the EM repository (this may take a while) ...
> >
> > May 23, 2007 10:56:19 AM oracle.sysman.emcp.EMReposConfig invoke
> >
> > INFO: Repository successfully dropped
> >
> > May 23, 2007 10:56:19 AM oracle.sysman.emcp.EMReposConfig
> > createRepository
> >
> > INFO: Creating the EM repository (this may take a while) ...
> >
> > May 23, 2007 10:56:19 AM oracle.sysman.emcp.EMReposConfig invoke
> >
> > SEVERE: Error creating the repository
> >
> > May 23, 2007 10:56:19 AM oracle.sysman.emcp.EMReposConfig invoke
> >
> > INFO: Refer to the log file at
> > C:\oracle\product\10.2.0\db_1\cfgtoollogs\emca\de
> >
> > v01\emca_repos_create_<date>.log for more details.
> >
> > May 23, 2007 10:56:19 AM oracle.sysman.emcp.EMConfig perform
> >
> > SEVERE: Error creating the repository
> >
> > Refer to the log file at
> > C:\oracle\product\10.2.0\db_1\cfgtoollogs\emca\dev01\em
> >
> > ca_2007-05-23_10-54-50-AM.log for more details.
> >
> > Could not complete the configuration. Refer to the log file at
> > C:\oracle\product
> >
> > \10.2.0\db_1\cfgtoollogs\emca\dev01\emca_2007-05-23_10-54-50-AM.log
> for
> > more det
> >
> > ails.
> >
> > Kira2 kenapa?
> >
> > Terima kasih
> >
> > Rgds,
> >
> > Herry
> >
> > DISCLAIMER:
> > This Message is confidential; it contents does not constitute a
> commitment
> > by PT. INDONESIA POWER, except where provided for in a written
> agreement
> > between you and PT. INDONESIA POWER. Any unauthorized disclosure,
use
> or
> > dissemination of the content, either whole or partial, is strictly
> > prohibited. If you are not the intended recipient of the message or
> you have
> > received this electronic transmission in error, please notify or
> contact the
> > sender immediately.
> >
> > PT.INDONESIA POWER is subsidiary of PT. PLN PERSERO which operates
in
> > power generating business. Through its 130 power plants, with a
total
> > capacity of 8,872 MW, PT.INDONESIA POWER has contributed
significantly
> to
> > the Java Bali interconnection system electricity supply.
> PT.INDONESIAPOWER operates through its eight generating Business Unit
> (GBU) : Suralaya,
> > Priok, Saguling, Kamojang, Mrica, Semarang, Perak Grati, Bali and
one
> > maintenance Services business unit (MSBU).
> >
> > [Non-text portions of this message have been removed]
> >
> >
> >
>
> [Non-text portions of this message have been removed]
>
> DISCLAIMER:
> This Message is confidential; it contents does not constitute a
> commitment by PT. INDONESIA POWER, except where provided for in a
> written agreement between you and PT. INDONESIA POWER. Any
unauthorized
> disclosure, use or dissemination of the content, either whole or
> partial, is strictly prohibited. If you are not the intended recipient
> of the message or you have received this electronic transmission in
> error, please notify or contact the sender immediately.
>
> PT.INDONESIA POWER is subsidiary of PT. PLN PERSERO which operates in
> power generating business. Through its 130 power plants, with a total
> capacity of 8,872 MW, PT.INDONESIA POWER has contributed significantly
> to the Java Bali interconnection system electricity supply.
PT.INDONESIA
> POWER operates through its eight generating Business Unit (GBU) :
> Suralaya, Priok, Saguling, Kamojang, Mrica, Semarang, Perak Grati,
Bali
> and one maintenance Services business unit (MSBU).
>
> [Non-text portions of this message have been removed]
>
> DISCLAIMER:
> This Message is confidential; it contents does not constitute a
commitment
> by PT. INDONESIA POWER, except where provided for in a written
agreement
> between you and PT. INDONESIA POWER. Any unauthorized disclosure, use
or
> dissemination of the content, either whole or partial, is strictly
> prohibited. If you are not the intended recipient of the message or
you have
> received this electronic transmission in error, please notify or
contact the
> sender immediately.
>
> PT.INDONESIA POWER is subsidiary of PT. PLN PERSERO which operates in
> power generating business. Through its 130 power plants, with a total
> capacity of 8,872 MW, PT.INDONESIA POWER has contributed significantly
to
> the Java Bali interconnection system electricity supply.
PT.INDONESIAPOWER operates through its eight generating Business Unit
(GBU) : Suralaya,
> Priok, Saguling, Kamojang, Mrica, Semarang, Perak Grati, Bali and one
> maintenance Services business unit (MSBU).
>
> [Non-text portions of this message have been removed]
>
> 
>

[Non-text portions of this message have been removed]

 



DISCLAIMER:
This Message is confidential; it contents does not constitute a commitment by 
PT. INDONESIA POWER, except where provided for in a written agreement between 
you and PT. INDONESIA POWER. Any unauthorized disclosure, use or dissemination 
of the content, either whole or partial, is strictly prohibited. If you are not 
the intended recipient of the message or you have received this electronic 
transmission in error, please notify or contact the sender immediately.

PT.INDONESIA POWER is subsidiary of PT. PLN PERSERO which operates in power 
generating business. Through its 130 power plants, with a total capacity of 
8,872 MW, PT.INDONESIA POWER has contributed significantly to the Java Bali 
interconnection system electricity supply. PT.INDONESIA POWER operates through 
its eight generating Business Unit (GBU) : Suralaya, Priok, Saguling, Kamojang, 
Mrica, Semarang, Perak Grati, Bali and one maintenance Services business unit 
(MSBU).



[Non-text portions of this message have been removed]

Kirim email ke