When a main switch got replaced today at one site we got notified and all of the items at the site also sent notifications. I have reviewed the instructions here <http://www.dartware.com/intermapper/immanual/chapter3/dependencies.html> but am not sure why it isn't working correctly. The main switch is designated as the Reference Point and has a star. The other items at the site (Airport Base Stations, a Mac Server and printers) all automatically linked to the main switch through an automatically generated network when the map was created.
Is it perhaps because the items (with their notifications) were pasted from a previous map instead of created on the map? The "shadowed device" status never happened.
Thanks, --
,-----/----. | O | O | Rich Battin | / | Apple Certified Technician | (__ | Academy School District 20 | \___|__/ | http://www.d20.co.edu '-----\----'
____________________________________________________________________
List archives: http://www.mail-archive.com/intermapper-talk%40list.dartware.com/
To unsubscribe: send email to: [EMAIL PROTECTED]
