Master branch point of view, there is no loose change regarding history.
Release branch point of view, I'll add whole history in the commit message with 
commit ID.
Thank you for your comment.

BR, Uze Choi
-----Original Message-----
From: Keane, Erich [mailto:[email protected]] 
Sent: Friday, May 22, 2015 9:03 AM
To: uzchoi at samsung.com
Cc: Lankswert, Patrick; iotivity-dev at lists.iotivity.org; soonhwang.choi at 
samsung.com; Mirani, Jawid; juney at samsung.com; Agrawal, Sachin; skykimjh at 
samsung.com
Subject: Re: Re: [dev] 0.9.1 release schedule

I still do, I'd much prefer to not lose history, otherwise we will have some 
pretty terrible times when it comes to merge 0.9.1-dev back into master (like I 
did with android-api).


On Fri, 2015-05-22 at 08:59 +0900, ???(Uze Choi) wrote:
> Erich,
> 
> I see, Then I'll pull from version just before darwin/ios build issues off 
> from master and push this code into the 0.9.1 release branch by one commit.
> I expect you may not have a concern.
> 
> BR, Uze Choi
> -----Original Message-----
> From: Keane, Erich [mailto:erich.keane at intel.com]
> Sent: Friday, May 22, 2015 8:52 AM
> To: uzchoi at samsung.com
> Cc: Lankswert, Patrick; iotivity-dev at lists.iotivity.org; 
> soonhwang.choi at samsung.com; Mirani, Jawid; juney at samsung.com; Agrawal, 
> Sachin; skykimjh at samsung.com
> Subject: Re: Re: [dev] 0.9.1 release schedule
> 
> I'm quite against it, as I have been the whole time.  I would suggest NOT 
> doing that entire list and only choosing the ones that are important fixes.
> 
> Additionally, I'd choose to leave the darwin/ios build issues off, since 
> we're not supporting darwin/ios on the .9.1 release.
> 
> Finally, normal git-merges are either not possible in gerrit, or are highly 
> discouraged.  We got an exception for CA due to its size, but I believe it 
> would be unnecessary and unreasonable to expect to do that here.  A 
> copy&paste merge would be even worse.
> 
> On Fri, 2015-05-22 at 08:47 +0900, ???(Uze Choi) wrote:
> > Hi Erich,
> > 
> > These are whole list updated after release_0.9.1 branch created.
> > Where is the patch related with feature/spec? most for updates are what I 
> > need to update into the release branch.
> > I think we need apply whole these code into master which means 
> > branch merging because there is no difference between Cherrypic one-by-one 
> > and merging whole change same time in current situation.
> > 
> > If there is still objection for branch merging, let me know right now.
> > 
> > BR, Uze Choi
> > -----Original Message-----
> > From: Keane, Erich [mailto:erich.keane at intel.com]
> > Sent: Friday, May 22, 2015 7:50 AM
> > To: uzchoi at samsung.com
> > Cc: Lankswert, Patrick; iotivity-dev at lists.iotivity.org; 
> > soonhwang.choi at samsung.com; Mirani, Jawid; juney at samsung.com; 
> > Agrawal, Sachin; skykimjh at samsung.com
> > Subject: Re: Re: [dev] 0.9.1 release schedule
> > 
> > Also: these are the only commits in difference:
> > + 00edd72ebece46be81e947afca414e72fc1acd27 Android Protocol Plugin
> > Manager API merge from android-api branch to master
> > + 81c1963fd6e3bd2a8a7f84931f5d93fad80176a5 Fix to use OC_IPV4 
> > + instead of
> > OC_ALL in Things Manager
> > + d5ac52e365b6059af167308b6966e056b39993f6 Fix for the prevent 
> > + issues
> > for Things Manager.
> > + 8432be2dd7a7d006605f33d26954aa6d53120536 Fix for the prevent 
> > + issues
> > for Notification Manager.
> > + 6d2db8d93a6664cf8065b90890cafc9003661123 Fix a race problem in
> > con-server application, Things Manager
> > + ce8b38eca80577f4168ae3df2685d634e4600085 Added IoTivity Primitive
> > Services Programmers guide
> > + e5c64768e55b4c2733eec4889d059202a02f351c Removed IoTivity v0.9.0
> > Primitive Service documents
> > + 1b02c81e5991d2d637a07429b3b94db71e11762c Fix for the prevent issue
> > with CID 65911 for Things manager
> > + 887d789ee50b0d2ca5e520d872aeb507ddbd0f31 Update Doxyfile for
> > generating Primitive Service C/C++ API
> > + 027b1c1ade99427ec95a8f734edf9ae37fb96cc5 Prevent fix in 
> > + notification
> > manager
> > + 25973756a67448dc33a0b479ae2b6877cee88842 Fix for tizen build 
> > + failure
> > issue.
> > + 3f675ba43da518741f67720132efdaa5ecafbc24 Fix darwin/ios build 
> > + issues
> > 
> > 
> > All of the "Fix" ones seem easy enough to pull, as is the remove and 
> > update.  Only the Protocol Plugin Manager Merge could possibly be any 
> > difficult, but if you do it first, you'll have no issues.
> > 
> > On Thu, 2015-05-21 at 22:42 +0000, ??? wrote:
> > > Erich
> > > I'm also afraid that lots of these sequential cheery pick patches 
> > > may scrub the IoTivity code from your suggestion.
> > > BR Uze Choi
> > > 
> > > 
> > > ---?? ???---
> > > ??? : Keane, Erich/erich.keane at intel.com ???? : 2015/05/22 06:54
> > > (GMT+09:00) ?? : Re: [dev] 0.9.1 release schedule This would not 
> > > be a good idea as Master already has a few patches that are 
> > > feature/spec related, which we don't want on that branch.
> > > 
> > > I suggest being EXTREMELY careful about what you pull over, but do 
> > > so via the cherry-pick mechanism.
> > > 
> > > -Erich
> > > 
> > > On Thu, 2015-05-21 at 21:51 +0000, ??? wrote:
> > > > Pat
> > > > During one or two days there are lots of patch regardins bugfix.
> > > > How about rebasing this release beanch with the latest master 
> > > > branch version by git branch merging?
> > > > BR Uze Choi
> > > > 
> > > > 
> > > > ---?? ???---
> > > > ??? : Lankswert, Patrick/patrick.lankswert at intel.com
> > > > ???? : 2015/05/22 01:35 (GMT+09:00) ?? : Re: [dev] 0.9.1 release 
> > > > schedule June,
> > > > 
> > > > 
> > > > 
> > > > The branch (0.9.1-dev) was created on 5/20. No direct changes 
> > > > will
> > > be
> > > > accepted to that branch. Bug fixes for the release should be 
> > > > pushed and validated on master and will be cherry picked by a 
> > > > maintainer to the release branch.
> > > > 
> > > > 
> > > > 
> > > > We are not calling the branch ?0.9.1-rel? to ensure that no one 
> > > > confuses the branch is the actual release. The releases will be 
> > > > clearly marked based on the tag names ?0.9.1-rc1?, ?0.9.1-rc2?? 
> > > > ?0.9.1?, etc.
> > > > 
> > > > 
> > > > 
> > > > Jawid,
> > > > 
> > > > 
> > > > 
> > > > Test plans may start running.
> > > > 
> > > > 
> > > > 
> > > > Pat
> > > > 
> > > > 
> > > > 
> > > > From: ???(June Yong Young) [mailto:juney at samsung.com]
> > > > Sent: Thursday, May 21, 2015 4:07 AM
> > > > To: Lankswert, Patrick; Agrawal, Sachin; 
> > > > iotivity-dev at lists.iotivity.org; '???'; '???'
> > > > Cc: Skarpness, Mark; Mirani, Jawid; Kesavan, Vijay S
> > > > Subject: RE: [dev] 0.9.1 release schedule
> > > > 
> > > > 
> > > > 
> > > > 
> > > > Hi Pat,
> > > > 
> > > > 
> > > > 
> > > > After long discussion, I think now we?ve reached a consensus to 
> > > > release 0.9.1 within end of May.
> > > > 
> > > > So, we are going to release ?0.9.1-RC1?by today (5/20) or 
> > > > tomorrow morning.
> > > > 
> > > > If you have any concerns, please let us know.
> > > > 
> > > > 
> > > > 
> > > > And ?0.9.1-dev? cannot be modified to ?0.9.1-rel?for now?
> > > > 
> > > > 
> > > > 
> > > > The following schedule is here below. 
> > > > 
> > > > - Schedule
> > > > 
> > > > . 5/20(or 21), Feature complete & Review Complete and make 
> > > > "0.9.1-RC1" release to QA
> > > > 
> > > > . 5/25, QA reports back.
> > > > 
> > > > . 5/26, "0.9.2-RC2" release just in case there is an issue 
> > > > occurs on basic functionality
> > > > 
> > > > . 5/28, QA to run Sanity check (about only the issue items)
> > > > 
> > > > . 5/29, Website Open
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > June Yong Young
> > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > > > 
> > > > IoTivity Release Function Lead
> > > > 
> > > > 
> > > > Samsung Electronics Co.,Ltd.
> > > > 
> > > > Software R&D Center, IoT Solution Lab. | Web & Convergence Team
> > > > 
> > > > Principal Engineer
> > > > 
> > > > T: +82-31-301-6107, M: +82-10-9530-6107
> > > > 
> > > > E-mail :juney at samsung.com
> > > > 
> > > > 
> > > > 
> > > > From: Lankswert, Patrick [mailto:patrick.lankswert at intel.com]
> > > > Sent: Tuesday, May 19, 2015 10:12 PM
> > > > To: juney at samsung.com; Agrawal, Sachin; 
> > > > iotivity-dev at lists.iotivity.org; '???'; '???'
> > > > Cc: Skarpness, Mark; Mirani, Jawid; Kesavan, Vijay S
> > > > Subject: RE: [dev] 0.9.1 release schedule
> > > > 
> > > > 
> > > > 
> > > > 
> > > > June,
> > > > 
> > > > 
> > > > 
> > > > Well, this schedule was not shared at the ISG meeting. Your 
> > > > cut-offs are before the spec A compliance delivery commit dates.
> > > > We will need to check with Vijay, but I believe that very little 
> > > > spec A work will make this release and will not be available for the 
> > > > plug fest.
> > > > 
> > > > 
> > > > 
> > > > Can you list the OIC members that are insisting on a May release?
> > > > 
> > > > 
> > > > 
> > > > Pat
> > > > 
> > > > 
> > > > 
> > > > From:???(June Yong Young) [mailto:juney at samsung.com]
> > > > Sent: Monday, May 18, 2015 8:19 PM
> > > > To: Lankswert, Patrick; Agrawal, Sachin; 
> > > > iotivity-dev at lists.iotivity.org; '???'; '???'
> > > > Subject: RE: [dev] 0.9.1 release schedule
> > > > 
> > > > 
> > > > 
> > > > 
> > > > Hi Pat,
> > > > 
> > > > 
> > > > 
> > > > June 5th release was changed to end of May release in the ISG
> > > meeting
> > > > last week.
> > > > 
> > > > It was because there are some OIC member companies to want May
> > > release
> > > > ASAP.
> > > > 
> > > > 
> > > > 
> > > > The following is the meeting minute that Deniel captured.
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > Release process discussion/owners: June and Pat (filling in for
> > > > George)
> > > > 
> > > > -release types: lightweight, agile-style releases and major 
> > > > releases
> > > > 
> > > > -release criteria for each release type, including go/no-go 
> > > > decision process
> > > > 
> > > > -quality criteria for each release type
> > > > 
> > > > -process for each type (branch vs tag, expected collateral,
> > > > announcement)
> > > > 
> > > > (Resolution)
> > > > 
> > > > 1) Release Schedule
> > > > 
> > > > May
> > > > 
> > > > 
> > > > Minor Release
> > > > 
> > > > 
> > > > Spec-A mandatory
> > > > features(Pre Release)
> > > > 
> > > > 
> > > > June
> > > > 
> > > > 
> > > > Plugfest
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > July
> > > > 
> > > > 
> > > > Minor Release
> > > > 
> > > > 
> > > > Spec-A compliant
> > > > feature +
> > > > Spec-B(partially)
> > > > 
> > > > 
> > > > August
> > > > 
> > > > 
> > > > Plugfest
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > October
> > > > 
> > > > 
> > > > Major
> > > > 
> > > > 
> > > > Spec-A/B compliant
> > > > feature
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > Minor
> > > > 
> > > > 
> > > > Every two month
> > > > 
> > > > 
> > > > April
> > > > 
> > > > October
> > > > 
> > > > 
> > > > Major
> > > > 
> > > > 
> > > > Twice a year
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > And the following is what I announced in the IoTivity session in
> > > OSWG
> > > > meeting.
> > > > 
> > > > 
> > > > 
> > > > cid:image001.png at 01D09156.D18120A0
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > June Yong Young
> > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > > > 
> > > > IoTivity Release Function Lead
> > > > 
> > > > 
> > > > Samsung Electronics Co.,Ltd.
> > > > 
> > > > Software R&D Center, IoT Solution Lab. | Web & Convergence Team
> > > > 
> > > > Principal Engineer
> > > > 
> > > > T: +82-31-301-6107, M: +82-10-9530-6107
> > > > 
> > > > E-mail :juney at samsung.com
> > > > 
> > > > 
> > > > 
> > > > From: Lankswert, Patrick [mailto:patrick.lankswert at intel.com]
> > > > Sent: Monday, May 18, 2015 11:39 PM
> > > > To: juney at samsung.com; Agrawal, Sachin; 
> > > > iotivity-dev at lists.iotivity.org; ???; ???
> > > > Subject: RE: [dev] 0.9.1 release schedule
> > > > 
> > > > 
> > > > 
> > > > 
> > > > June,
> > > > 
> > > > 
> > > > 
> > > > The original dates from the ISG meeting were EoMay (May 29th) 
> > > > for feature complete and June 5th for code freeze. Why has this 
> > > > been changed?
> > > > 
> > > > 
> > > > 
> > > > Pat
> > > > 
> > > > 
> > > > 
> > > > From: JuneYong Young [mailto:juney at samsung.com]
> > > > Sent: Monday, May 18, 2015 2:21 AM
> > > > To: ???; Agrawal, Sachin; Lankswert, Patrick; 
> > > > iotivity-dev at lists.iotivity.org;???;???
> > > > Subject: Re: [dev] 0.9.1 release schedule
> > > > 
> > > > 
> > > > 
> > > > 
> > > > To all,
> > > > 
> > > > 
> > > > 
> > > > I've slightly revised some items below after discussion with 
> > > > Samsung QA.
> > > > 
> > > > 
> > > > 
> > > > - 0.9.1 : ?Spec vA Mandatory features?
> > > > 
> > > > - Schedule
> > > > 
> > > > . 5/20, Feature complete & Review Complete and make "0.9.1-RC1"
> > > > release to QA
> > > > 
> > > > . 5/25, QA reports back.
> > > > 
> > > > . 5/26, "0.9.2-RC2" release just in case there an issue occurs 
> > > > on basic functionality
> > > > 
> > > > . 5/28, QA to run Sanity check (about only the issue items)
> > > > 
> > > > . 5/29, Website Open
> > > > 
> > > > - Mandatory items must be completed
> > > > 
> > > > . Any basic functionality should be working
> > > > 
> > > > . Merge CA(connectivity Abstraction) branch onto one master 
> > > > branch
> > > > 
> > > > - The items strongly requested, but no gating issues to release
> > > > 
> > > > . BT/BLE Support, Noti. Manager, Android API
> > > > 
> > > > . If any issues related to these items, they will be described 
> > > > as known issues.
> > > > 
> > > > - QA
> > > > 
> > > > . P1 problems to be fixed.
> > > > 
> > > > If it is not fixed, then it has to be lowered down to P2 after 
> > > > discussion with QA.
> > > > 
> > > > 
> > > > 
> > > > To Pat,
> > > > 
> > > > George is a release manangement function counter part of Intel side.
> > > > 
> > > > Please check with Intel QA since George is not present now.
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > Regards
> > > > 
> > > > June
> > > > 
> > > > 
> > > > 
> > > > June Yong Young
> > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > > > 
> > > > IoTivity Release Function Lead
> > > > 
> > > > 
> > > > Samsung Electronics Co.,Ltd.
> > > > 
> > > > Software R&D Center, IoT Solution Lab. | Web & Convergence Team
> > > > 
> > > > Principal Engineer
> > > > 
> > > > T: +82-31-301-6107, M: +82-10-9530-6107
> > > > 
> > > > E-mail :juney at samsung.com
> > > > 
> > > > 
> > > > 
> > > > ------- Original Message -------
> > > > 
> > > > Sender : ???<juney at samsung.com> S6(??)/??/IoT Solution
> > > Lab(S/W
> > > > ??)/????
> > > > 
> > > > Date : 2015-05-15 11:40 (GMT+09:00)
> > > > 
> > > > Title : [dev] 0.9.1 release schedule
> > > > 
> > > > 
> > > > 
> > > > To all,
> > > > 
> > > > 
> > > > 
> > > > According to the discussion result in the last ISG & OSWG F2F
> > > meeting,
> > > > 
> > > > we will release & open 0.9.1 at the end of May with schedule driven.
> > > > 
> > > > 
> > > > 
> > > > So, 0.9.1 will be released based on the following. If any 
> > > > questions
> > > or
> > > > concerns, then let us know.
> > > > 
> > > > 
> > > > 
> > > > - 0.9.1 : ?Spec vA Mandatory features?
> > > > 
> > > > - Schedule
> > > > 
> > > > . 5/22, Feature complete & Review Complete
> > > > 
> > > > . 5/28, exit from QA
> > > > 
> > > > . 5/29, Website Open
> > > > 
> > > > - Mandatory items must be completed
> > > > 
> > > > . Merge CA(connectivity Abstraction) branch onto one master 
> > > > branch
> > > > 
> > > > - The items strongly requested, but no gating issues to release
> > > > 
> > > > . BT/BLE Support, Noti. Manager, Android API
> > > > 
> > > > - QA
> > > > 
> > > > . P1 problems to be fixed.
> > > > 
> > > > If it is not fixed, then it has to be lowered down to P2 after 
> > > > discussion with QA.
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > June Yong Young
> > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > > > 
> > > > IoTivity Release Function Lead
> > > > 
> > > > 
> > > > Samsung Electronics Co.,Ltd.
> > > > 
> > > > Software R&D Center, IoT Solution Lab. | Web & Convergence Team
> > > > 
> > > > Principal Engineer
> > > > 
> > > > T: +82-31-301-6107, M: +82-10-9530-6107
> > > > 
> > > > E-mail :juney at samsung.com
> > > > 
> > > > 
> > > > 
> > > > From:iotivity-dev-bounces at lists.iotivity.org
> > > > [mailto:iotivity-dev-bounces at lists.iotivity.org] On Behalf Of
> > > Agrawal,
> > > > Sachin
> > > > Sent: Friday, May 15, 2015 8:30 AM
> > > > To: Lankswert, Patrick; iotivity-dev at lists.iotivity.org
> > > > Subject: Re: [dev] Last call for contributions for 0.9.1
> > > > 
> > > > 
> > > > 
> > > > 
> > > > Hi Pat,
> > > > 
> > > > 
> > > > 
> > > > Can you clarify this statement?
> > > > 
> > > > ?Failing to do so will result in your contribution being held 
> > > > until the next release?
> > > > 
> > > > 
> > > > 
> > > > My assumption is that ?master? will still be open for code
> > > check-ins,
> > > > except that the check-in?s
> > > > 
> > > > after May 28th will NOT be tagged for 0.9.1 release. 
> > > > 
> > > > Is that right?
> > > > 
> > > > 
> > > > 
> > > > Thanks
> > > > 
> > > > Sachin
> > > > 
> > > > 503-264-8071
> > > > 
> > > > 
> > > > 
> > > > 
> > > > From:iotivity-dev-bounces at lists.iotivity.org
> > > > [mailto:iotivity-dev-bounces at lists.iotivity.org] On Behalf Of 
> > > > Lankswert, Patrick
> > > > Sent: Wednesday, May 13, 2015 2:21 PM
> > > > To: iotivity-dev at lists.iotivity.org
> > > > Subject: [dev] Last call for contributions for 0.9.1
> > > > 
> > > > 
> > > > 
> > > > 
> > > > To all,
> > > > 
> > > > 
> > > > 
> > > > The following dates are important for the 0.9.1 release:
> > > > 
> > > > June 5th ? Code Freeze
> > > > 
> > > > May 28th ? Feature Complete and Review Complete
> > > > 
> > > > 
> > > > 
> > > > It is important that contributions be completed by May 28th, so 
> > > > that system testing may start.
> > > > 
> > > > 
> > > > 
> > > > If you have a contribution that you want considered for 0.9.1 
> > > > that
> > > is
> > > > not already in gerrit review, you must announce on this list 
> > > > with an estimated date for your submission. Failing to do so 
> > > > will result in your contribution being held until the next release.
> > > > 
> > > > 
> > > > 
> > > > We are working on a more formal release schedule process what 
> > > > will
> > > be
> > > > published on the wiki.
> > > > 
> > > > 
> > > > 
> > > > Pat
> > > > 
> > > > 
> > > > 
> > > > Patrick Lankswert
> > > > 
> > > > Discovery and Connectivity (Core Stack) Maintainer
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > 
> > > > _______________________________________________
> > > > iotivity-dev mailing list
> > > > iotivity-dev at lists.iotivity.org
> > > > https://lists.iotivity.org/mailman/listinfo/iotivity-dev
> > > 
> > > 
> > > 
> > > 
> > > 
> > 
> > 
> 
> 


Reply via email to