[ 
https://issues.apache.org/jira/browse/AMBARI-21709?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Andrii Tkach updated AMBARI-21709:
----------------------------------
    Attachment: AMBARI-21709.patch

> Finalize Warns that it is Permanent Even For PATCH Upgrades
> -----------------------------------------------------------
>
>                 Key: AMBARI-21709
>                 URL: https://issues.apache.org/jira/browse/AMBARI-21709
>             Project: Ambari
>          Issue Type: Bug
>          Components: ambari-web
>    Affects Versions: 2.5.3
>            Reporter: Andrii Tkach
>            Assignee: Andrii Tkach
>            Priority: Critical
>             Fix For: 2.5.3
>
>         Attachments: AMBARI-21709.patch, Screen Shot 2017-08-03 at 2.01.52 
> PM.png
>
>
> Perform either a {{PATCH}} or {{MAINT}} upgrade and get to Finalize. The 
> upgrade wizard warns that finalization is permanent.
> {quote}
> Your cluster version has been upgraded. Click on Finalize when you are ready 
> to finalize the upgrade and commit to the new version. You are strongly 
> encouraged to run tests on your cluster to ensure it is fully operational 
> before finalizing. You cannot go back to the original version once the 
> upgrade is finalized.
> {quote}
> This is not true for certain upgrade types. Finalization is a required step, 
> yes, but you can still revert {{PATCH}} and {{MAINT}} upgrades that have 
> finalized. The message for these types should read something like:
> {quote}
> The {{PATCH}} upgrade to HDP-2.5.4.0-1234 is ready to be completed. After 
> finalization, the patch can be reverted from the Stacks and Versions page if 
> it is no longer required."
> {quote}



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to